Loading...
DR9201-CS 920618COPPELL PUBLIC WORKS DATE: TO: FROM: RE: ~une XS, xgg~ Steven G. Goram, Director of Public.ks Rey Gonzales, Streets Superintenden~ Howell and Bullock Drainage and Paving Improvements (Tickler 6/17/92) Based on my inspection of this project and discussions with the contractor, the drainage improvements should be completed byweek's end and the paving replacements should b%~mplete by 6/26/92 along with the hydromulching. Next status 6/~9/92.