Loading...
DR9201-CS 920327The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 March 27, 1992 Dear Resident: This letter is a follow-up to the letter you received from the Director of Public Works last month dated 2/19/92 regarding the drainage improvement in your area. The bids have been processed and the successful bidder is Gregory Equipment, Inc. The City Council awarded the bid on 3/24/92 and the contractor will be receiving a notice to proceed within the next week. Once he has received this notice he will start the project, weather permitting, within two (2) weeks. I have attempted to contact all of the residents affected by this project by phone. Those that I did reach were given a brief overview of the project and their questions answered. For those of you whom I wasn't able to reach by phone, the following is provided for your convenience: -- Ail ditches along the right-of-way will be reestablished and hydromulched. -- Ail culverts in drives will be upgraded. -- Existing underground system will be put back in place. -- Driveways will be repaired to original condition. -- Railroad right-of-way swale will be reestablished. If I didn't get an opportunity to speak with you on the phone and you have any questions, please feel free to contact me at 462-8495. Sincerely, ~ Rey ~onzales Street Superintendent RG/bc cc: Steven G. Goram, Director of Public Works