ST9302-CS 990106Kimley-Horn and Associates, Inc. January 6, 1999 Mr. Ken Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Boulevard P.O. Box 478 Coppell, TX 75019 Re: Project #ST 93-02 Sandy Lake Road Paving, Drainage, and Water System Improvements KHA No. 06940600 Dear Ken: In preparation of the additional plan sheet for the first 16" water line lowering and the exhibits for temporary domestic services for the strip shopping center east of Moore Road and the UPS center, I have come across several items that require your consideration. You may recall from our December monthly meeting that there was some confusion regarding the removal and replacement of the sanitary sewer manhole at station 15+77.13 (sheet 2A). The contractor raised the question of why this was necessary since the plans also show plugging the line entering the manhole from the west. When I prepared the new 16" water line sheet, I discovered that the 8" sanitary sewer line west of the manhole in question was originally planned to be abandoned. I have reviewed the plans and spoken briefly with Mr. Glen Hallowell regarding the need to keep this line in service, and I have not been able to find any justification for doing so. If this is true, I recommend plugging and abandoning the line and removing the existing manhole in question. Depending upon the condition of the existing lines entering the manhole from the south and leaving the manhole to the north, a sleeve and new section of line could be used to join these lines, or a completely new line could be used. Please verify that there are no existing service connections to this sanitary sewer line upstream of the manhole. If no existing or planned future service connections exist, I will prepare a Request for Prices for this work. On sheet 11 of the plans (see attached), an existing 8" sanitary sewer line is called out as "...to be relocated by others.' It is my understanding that this line is to be (or already has been) relocated to the south. As its position will affect the alignment of the 6" temporary domestic service line to be constructed for service of the strip shopping center, please verify and sketch on the attached plan sheet the approximate location of the relocated 8" sanitary sewer line. This will allow me to proceed with setting the horizontal and vertical alignment of the temporary service line. [] TEL 817 335 6511 MET 817 654 4266 FAX 817 335 5070 [] Suite 1100 801 Cher~ Street FodWodh, Texas 76102-6803 Kimley-Horn City of Coppell Sandy Lake Road Paving, Drainage, and Water System Improvements and Associates, Inc, January 6, 1999, Page 2 Prior to Christmas, I received a phone call from Mr. Alford Main of M-Co Construction, Ed Bell's utility subcontractor. Mr. Main stated that there would be a lead-time of 6 to 8 weeks for the 16" gate valves to be cut in. This lead-time is for the standard 16" gate valve with the attached bypass valve. Mr. Main further stated that he could use a 16" gate valve without an attached bypass valve and use fittings and a separate bypass valve, but this configuration would not fit in the standard vault. This 16" gate valve is immediately available, and he can proceed if the city will allow a valve vault modification. Please review the attached sketch and inform me of your decision on whether or not to allow the modified vault. The price proposal that Robert Weber recently submitted was applicable for either 16" gate valve option. Thank you very much for your assistance with these matters. I look forward to continuing to work with you in 1999. Very truly yours, Kimley Horn and Associates, Inc. Michael G. DeMotte, E.I.T. MGD:pts attachments P:\93021.00~93021 LTR\ISSUES.DOC SCALE: 1"=20' ~ ~ln I II .--- BRIC,'< WALL VAULT. REMOVE EXISTING VAULT ~.~ ~ ~J~ ~ ,J ~'~ NEW VAULT. SEE- VAULT DETAIL. ~ ~j ~ j .. TEL RISER o ~- ~ '¢ ~ I ASPHALT APPROACH ........ ~T~ '60+456~ ~5 R~T i' ~ ' 5OO 490 EXISTING GROUND @~8" SS -- PROPOSED GROUND / -- STA 60+45.64 .. ,~ , RIM ELEV = 4-90.87 r;~-Co Construction, Inc. 6816 Harmonson N. Richland Hills, Texas, 76180 OFFICE: Metro(817) 589-7601 FAX: Me~o(817) 589-9155 . ,.. .. ~..~ ,-- ....,.. .~--¥ r'.l~ o ,o ,, 1 .... · ': '. ~,-.. ;l"'. ~...~_, ./,.~. ~, , 16" Valve w/4" Bypass for D. I. Pipe JAM 14 '99 09:~8AM KIMLEY-HORM FT WORTH and ,~0daies, inc. Suite 1 iiX) 801 Chcr~y Su'eet Fo~ WoeLh, TX 76102-6503 T£L 817 335 6~11 FAX 817 335 50'70 Fax Transmittal Date, I /{ 4 Project Name: ~. Ofe~,- No. OGto q.oO Fax# c~'"/'Z_/'~o4~ ~,5'--70 Name Organization C-~ ~r -r CrF Fax # 2.,i '~ /35'7- - 5-2_o[ Name Organization_. ~'~ Organization 'nFL ~5 Organization ~_~ ~4~-- ~-, ~ To: Fax # .., Name Organization Total Number of Pages Including this Cover She, ct Pla~n~n9 E~v~rOnm~ntat Consultants inJonded recipietq or Ihe employee or agenl responsible for delivery to the addressee, you am hereby notdied that any review, dissemination, disclosure, or copying of this communication iS strictly prohibited, Il you have roceiveO this facsimtle tn error, please immediately notify us by teteoh~ne, and return lhe ortginal ~acsimite lo us at the address above wa the U.S, Festal Service. Thank you.