Loading...
ST9302-CS 990102 (2)FAX (214) 352-3201 '~ TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 January2,1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re~ Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: As you are aware the existing storm sewer junction structure shown at STA 55+39.37 Lt. is actually closer to the proposed roadway centerline than is shown on the plans. As a result, the proposed 21" storm sewer lines to the east and west of Moore Road will need to be connected into the existing 66" storm sewer. As requested, our utility subcontractor, M-Co Construction, has submitted pricing for those field connections. Our price for each of the two pipe to pipe connections is $825.00. Please add an additional two calendar days to the project's duration for this work. If you have any questions regarding this issue, don't hesitate to contact our office. Sincer,e, ly, ~-Bm~ C~onst~'i~ction Company Robert D. Weber Project Engineer XGZ Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER