Lauren Estates-CS 990611 214 J04 J570
~0~18/99 07:34 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL
N0.248
DEVELOPMENT FEE WORKSHEET
PROdECT: L,~ren
DATE: 6/11/99
"Reason for Additional Fees: Delete one 5/8'x3/4" domestic meter,
add one 1" do ·
mestic meter, add one 1 1/2" ~rrigation meter
Water Impact Fee:
Total #: 6.5 ESU's ~ $450.00 ea.
'i150% due prior to Council al~rOvel of the final plat)
Water Tap lnspectiou Fee: ~
Total/k. _g=:~Connections ~ $50.00 ea.
(Single family due priOr to issuance of bu~in" pemfit)
(Ail other developments due prior to issuanCe of meter)
Domestic Water Meter Fee:
Deleted <--- Total 8: 1 Domestic Meter(s) ~ $25.6?
Added Total 8: __ t Domestic Meter(s) (~) $56.44
(Single family due prior to issuance of building permit)
(AJI olher devefopmants due prior to issuance of meter)
Irr/gafion/FireUne Water Meter Fee:
Total 8: 1 Irrigatio~ Mater(s) ~ St35.66
Total 8:. 0 Ad0ifional Irrlgat/on Meter(s) ~ $0.50
Total 8: 0 ' Fireline Mater(s) ~
$0.00
(l~ue prior to iSsuance of water maters) - -
Dome~tlc Water Meter Deposit Fee:
Total #: -L~-~__ Meter(s) ~ $35.00 ea.
(100% due prior to issuanCe of water meters)
Irt/garCon/Fire Meter Deposit Fee:
Total 8: 1 Meter(s) ~ $30.00 ea.
(100% due prior to issuance of water mate~)
Weetewater Impact Fee:
Total Domes~ Meters ESU's:
Wa~tewater Tap Inspection Fee:
1.5
Total #: 0 Connections ~ $50.00 ea.
(t~ue ~r/or to I~=uance of building
Page I
__
__ $0.00
.. SO.O0
08×18/99 0?:34 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.248 Q02
RANDLE & RANDLE CONSTRUCTION SYSTI=M$' INC 1. 0 ~ '7
lol N IRVIN~ H£1GHT~; DRIVE
~I~VING. TX 7.50~1
J $ ~dls~r. JO