Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
TexasBank 2R-LR050706
.... ~ ~oo3 07/12/05 TUF. 09:17 TEl. 9724883500 GEOSCIENCE ENGINEERI: G GEOSCIENCE ENGINEERING ~& TESTING, INC. GEOTECHNICAL & MATERIALS ENGINEERS COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppeit Crbme de ta Crbme, L. FL c/o Project Sotutions Group Herndon, Virsinia 20170 PROJECT: Proposed "Cr~me de la Creme Coppe[[, Texas DATE OF REPORT: 07/06/05 REPORT NO. 05-DM2605-35a SAMPLE DATE: 06/08/05 CONTRACTOR: B.B. Enterprises TICKET NO.: 89045331 AMBIENT TEMP. (°F): 89° CONCRETE TEMP. (dF): 77° TIME BATCHED: 2:57 pm TIME SAMPLED: 3:20 pm WEATHER CONDITION: Sunny CONCRETE SUPPLIER: Beau PLANT/TRUCK: 89/103 MIX ID NUMBER: 24011501 WATER ADDED (ssi): 1'0 SLUMP (inches) (ASTM C-143) 5 LOCATION OF PLACEMENT: Grade beams: Along t~ east side CONCRETE CYLINDER COMI~RESSIVE STRENGTH TESTS Standard 6" x 12", ;~8.27 square nches CYLINDER AGE DATE TOTAL COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED LOAD (tbs) ~ STRENGTH (psi) STRENGTH (ps~) 49 7 06/15/05 108,100 ~ 3,823 4,000 psi/28 Days 50 28 07/06/05 128,350 4,540 51 28 07/06/05 129,400 i 4,577 §2 Hotd Specifications: Makin!~ E Curing: ASTM C-143 ffesttn~ Methods: ASTM C-143, ASTM C-39 GETITechnician: Rico Reviewed by: -"~Syed S. Af'sa~ P. Et Project Ensine-e~'