Loading...
TexasBank 2R-LR05062907/12/05 TiE 09:16 ri'El, g724883500 GE(ISCIENCE ENGINI(I~RING ~002 GEOSCIENCE ENGINEERING ~& TESTING, INC. GEOTECHNICAL,, ,, & M~TERIALS ENGINEERS COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppett Crbme de ta Cr&me, LP. c/o Project Solutions Group Hemdon, Virginia 20170 PROJECT: Proposed "Cr&me de ta Crgme'" Coppet[, Texas DATE OF REPORT: 06/29/05 REPORT NO. 05-DM2605-33a SAMPLE DATE: 06/O1/05 CONTRACTOR: B.B. Enterprises TICKET NO.: 13642799 AMBIENT TEMP. (°F): 87° CONCRETE TEMP. (°F): 78° TIME BATCHED: 12:42 pm TIME SAMPLED: 1:20 pm WEATHER CONDITION: P. Sunny CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: WATER ADDED (SAD: SLUMP (inches) (ASTM C-143) 8eait 13/105 24011501 0 '4 LOCATION OF PLACEMENT: Grade beams: Along the west side CONCRETE CYLINDER COMI~RESSIVE STRENGTH TESTS Standard 6" x 12", :[8.27 square inches CYLINDER AGF DATE TOTAL COMPRESSIVE REQUIRED COMPRESSIVE HUMBER {days) TESTED LOAD (lbs) i STRENGTH (psi) STRENGTH (psi) 45 7 06/08/05 99,750 3,528 4,000 psi/28 Days 46 28 06/29/05 128,100 ~ 4,531 47 28 06/29/05 129,300 : 4,573 48 Hold Specifications: Making ~ Curing: ASTM C-143 ITesting Methods: ASTM C-143, ASTM C-39 GETI Technician: R~go !Reviewed by: Project Engineer