Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
TexasBank 2R-LR050623
07/12/05 TIiE 09:18 TEL 9724883500 GEOSCIENCE ENGINEERING GEOSCIENCE ENGINEERING & TESTING, INC. ' GEOTECHNICAL & M~TERIALS ENGINEERS ~008 COMPRESSIVE STRENGTI~i OF CONCRETE REPORT CLIENT: PROJECT: Coppel[ Cr~me de ta Crbme, t.l~. c/o Project Sotutions Group Herndon, Virginia 20170 Proposed "Cr~me de ta Crbme"! CoppeL[, Texas DATE OF REPORT: 06/23/05 REPORT NO. 05-DM2605-38a SAMPLE DATE: O6/16/O5 CONTRACTOR: B.B. Enterprises TICKET NO.: 13643663 AMBIENT TEMP. (°F): 82° CONCRETE TEMP. (*F): 85° TIME BATCHED: 8:58 am TIME SAMPLED: 9:40 am WEATHER CONDITION: Sunny CONCRETE SUPPLIER: Beall PLANT/TRUCK: 13/171 MIX ID NUMBER: 24011504 WATER ADDED (8al): 0 SLUMP (inches) (ASTM C-143) 5 LOCATION OF PLACEMENT: Approach: Area alongjDenton Ta CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", t8.27 square fnches CYLINDER AGI" DATE TOTAL COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED LOAD (lbs) i STRENGTH (psi) STRENGTH (psi) 69 7 06/23/05 99,700 3,526 4,000 psi/28 Days 70 28 07/14/05 71 28 07/14/05 72 Hold Speclflcetfon$: Making Et Curing: ASTM C-143 Testing Methods: ASTM C-143, ASTM C-39 GETI Technician: Jose i Reviewed by: -.,.~ ,-~, ~ ~,_._~ ' Sy~'d S. ~fsar~ E. Project Engineer