Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
TexasBank 2R-LR050523
05/25,'05 WED 14:18 TEL 9724583500 GEOSCIENCE ENGINEERING ' i GEOSQIENCE ENGINEERING & TESTING, INC. GEOTECHNICAL & M~TERIALS ENGINEERS ~o10 COMPRESSIVE STRENGTI~ OF CONCRETE REPORT CLIENT: Coppe[t Cr&me de la Cr&me, L.Pi c/o Project Solutions Group Herndon, Virginia 20170 PROJECT: Proposed "Cr&me de {a Cr~me" Coppeit, Texas DATE OF REPORT: 05/23/05 REPORT NO. 05-DM2605-28c SAMPLE DATE: 05/16105 CONTRACTOR: B.B. Enterprises TICKET NO.: 8904408 AMBIENT TEMP. (°F): 77° CONCRETE TEMP. {*r): 70~ TIME BATCHED: 2:10 pm TIME SAMPLED: 2:50 pm WEATHER CONDITION: P. Cloudy CONCRETE SUPPLIER: Beail PLANT/TRUCK: 89 / 102 MIX ID NUMBER: 23011501 WATER ADDED (iai): 0 SLUMP (inches) (ASTM C-145) 5 LOCATION OF PLACEMENT: Piers: 1.5-2, J-2, J-Z.5~ J-3.8 CONCRETE CYLINDER CoMprEssIvE STREI~GTH TESTS Standard 6" x 1Z"; Z~.Z7'square Inches CYLINDER AGE DATE TOTAL ~ COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days], TESTED LOAD (lbs) i STRENGTH (psi) STRENGTH (psi) 29 7 05/23/05 87,250 3,086 * psi/28 Days 30 28 06/13/05 i 31 28 06/13/05 32 Hold ~ Specifications: Making Ft Cudrlg; ASTM ¢-143 Testing Methods; ASTM C-143, ASTM C-39 GETI Technician: Jorge Reviewed by; Project Engineer