Loading...
Leonard Estates-CS 971211The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-4.62-0022 December 11, 1997 Karen Leonard 517 Arbor Brook Coppell, TX 75019 Leonard Estates Development Fee Assessment Dear Ms Leonnrd: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $3,490.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Ke~nbth M~ ~riffta, P.E. Director of'Engineering & Public Works CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Leonard Estates Date: 12/11/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $900.00 $900.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $24.14 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $24.14 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $450.00 $450.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $1,285.00 $1,285.00 (100% due prior to Council Approval) Roadway Impact Fee $855.00 $855.00 (100% due prior to Council Approval) Street Light Fee (100% due prior to Acceptance of Project N/A Street Sign Fee (100% due prior to Acceptance of Project N/A Construction Inspection Fee Need Submittal of development contracts TOTAL $3,803.28 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $3,490.00 DEVELOPMENT FEE WORKSHEET PROJECT: Leonard Estates DATE: 12/11/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): I - 5/8 inch X 3/4 inch I - 5/8 inch X 3/4 inch Fireline Meter(s): Total #: 2 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due Prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $24.14 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $24.14 Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' @$450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's $900.00 $100.00 $24.14 $24.14 $0.00 $0.00 $30.00 $35.00 $450.00 $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A N/A Single-family ~ 9350.00 / Lot Multi-family @ 9350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: 1 N/A Single-family @ 91285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, 9292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A $1,285.00 N/A 9855.00 N/A Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) N/A Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submilzal of development contracts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Leonard Estates DATE: 12/11/97 ROADWAY IMPACT FEE: Service Area * Category ** Land Use ** Building Size (Scl. Ft.) Development Units ** Vehicle Miles per Development Unit ** 2 Residential Single-Family Detached N/A 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Uni0 x (Fee per Vehicle Mile) = $855.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) L ............... ========================================================================= d CURT LEONARD JR KAREN R LEONARD 331 TANGLEWOOD LANE COPPELL, TX 75019 ~ Merrill I~nch