Loading...
WA9801-CS 991221 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: larry Davis, Construction Inspe~or Engineering Danny Hightower, Ut'flities Division December 21, 1999 Walk-thru State Highway 121 Water Line 1. Paint MLV at Sandy Lake and Royal; mark in blue. 2. Replace broken pad on Sandy Lake and 121 on one valve. Need a pad around another valve on 121. 3. Remove work sign. 4. Repair concrete at Sandy Lake and Royal--broken. 5. Air relief needs screens and clean below cut off valve. 6. Air relief needs repair at 35 + 90. It's bent over inside can. 7. F'we hydrant needs painting at 41 + 100. 8. Need to inspect all fire hydrants once water is turned on. 9. Need good water samples to turn water on, check lines and f'we hydrants. 10. Dress up landscape per Larry Davis. CITY OF COPPELL PUBLIC WORKS DEPARTMENT MESSAGE CONF I RMAT I ON 12×28×99 15:81 ID--CITY OP COPPELL DATE 12/28 S,R-TIME DISTANT STATION ID MODE PAGES 01~16" CITY OF COPPELL CALLING 05 RESULT OK 0000 ~II too SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 ROSS L JACOBS, P.E. RONALD V CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. PAUL A. CARLINE, P.E. MATT HICKEY, P.E. Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 December 15, 1999 Transmitted Via Facsimile H & W Util)ty Contractors 305 Mai~,Street Lak~Ddllas, Texas 75065 Re: City of Coppell State Highway 121 Water Line Final Walk Through Gentlemen: We are in receipt of the construction record drawing mark-ups provided by your project superintendent and have delivered the revised drawing to Mr. Larry Davis for his review and comment. As such, the City has scheduled a final walk-through for Tuesday, December 21, 1999 at 2:00p. m., starting at the Sandy Lake Road/Royal Lane Intersection. By copy of this letter, we have forwarded your final quantities and pay request to Mr. Davis for his review and concurrence. Once we receive his acceptance, we will forward an affidavit of final payment and waiver of release to your office for execution. We are available to discuss this project further at your convenience. Gary C. Hendricks, P.E: cc: Mr. Lan'y Davis w/enclosure ~r. Glenn Hollowell, P.E.