ST9802-CS000906 MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
From:
Date:
RE:
Garreth Campbell, Construction Inspector Engineering
Danny Hightower, Utilities Division
September 6, 2000
Follow-up Walk-thru Dividend Dr.
1. All O.K.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
MESSAGE
CONF I RMAT I ON
09/0?/00 0?: 4~
ID--CITY OF COPPELL
DATE S~R-TIME
09×0? 00'20"
DISTANT STATION ID MODE PAGES RESULT
CITY OF COPPELL CALLING 01 OK 0000
Phone Number:
Check for: Acctu'acy test:
Initial meter relocation hupecdous
WAT~v-~ ~ J !
Employee: ~ ~ Grid map:
Address: '"
Meter L~a~: ~ck ~ter press~:
~c-read
1. ~ 2. Reuair
3. ~ 4. Other
Backflow Imp.
Bkflow Cert. Date
Re-Cert. Date
A. Main Linc A. Pump A. Line Locate
B. Valves B. Water Tower B. Line Locate
C. Service Line C. Samples C. Tap
D+ Hydrants D. Equipment D Excavation
E. Safety
5. Reason for failure: A. Electrolysis B. ~ Consmiction C Poor Installation D. Other
6. List of safety equipment at site if applicable:
A. Ban'icades B. Cones C. Tape D. Lights E. Other
7. If Meter/Service Leak: Classify: - City:
A. Water Loss (estimate): GPM __
B. Was Water Metered: Yes
C. Was Customer Notified: Verbally
Customer
8. If Meter Change Out:
A. Old Meter # Reading
B. New Meter # Reading
C. Old .Meter Size. Type:.
E. Type of work performed or findings:
Fire plug flushing
Total GaHous
No
Doorknocker -
Vehicle/Equipment Used
Unit # Miles Hrs Equipment
D New Meter Size/Type
9. If maiuiine or deep service repair, describe ~ype of pipe or service line and condition:
10. Man-hours: Crew Members.
11. List Materials Used:
'7') d,-,/~'., ,-~
12. If you had an accidenrlncident while performing this request. Did you repor~ it? Yes or no
13. Water Utilities meter inspection: pass or fail
14. How many trips to do task?
Signature
,~...~atn rJue .,~ A. tJsse r.o~ae
B. V',tv~ B. Wa~ To~,~ &Um f..~am
C. S~,~.ce Line C. Saaq~ C, T~
D. H~k~.,~ D. Eq,~....~. D ;'~'~m~.
7. [L~.-'_~Sa'v~ K.nk: ~ - City:
A. W~er Lass (~):
& Was Was~/~ss~l:
C. w~, C~n~r.~ Ved~lly
New ~..~ ~ R~:lin$
T.v~e a~"~ck ~x-~'.armed ar gu:tdinis:
D New .~*.ce~ Siz~'TF~e
C:'-'~
13. wa:.-: L.'~tLv:es .-e.~.-t. :,~;eccian: ~s ,ar fait
~PHONE CALL
M ESSAG~ - ~b~; CALL
' Wt~ CALL
~IGN~O - SECOND ~R~ECYCLED / ~ FORM 74620 ~
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To:
From:
Date:
RE:
larry Davis, Construction Inspector Engineering
Larry Morton, Streets Division Public Works
September 6, 2000
Walk-thru Dividend Dr. 8/30/00
Rout and seal random cracks in left turn lanes.
Seal curb joints in left turn lanes.
Follow-up Walk-thru 8/30/00
1. All O.K.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT
MESSAGE
CONF I RMAT I ON
09×06/00 08: ~
ID--CITY OF COPPELL
DATE
0~×06
S~R-TIME
OO~21"
DISTANT STATION ID MODE PAGES RESULT
CITY OF COPPELL CALLING O1 OK 0000
15:i9
214 J~ ~570
CITY OF COniLL ENGINEERING ~ CITY OF COPPELL
NO. 581
MEMORANDUM
FROM
DEPARTMENT OF ENGEq'EER G
...Mike Mar~n, Azs~. City Engineer
Glum HoHow~ll, D~r of~b? W~
~ Tra~~~Gr*g Jones, ~fB '
From: L~~om~cfi~
Date: Augu~ 24, 2~
WALK-THRU for Lam Lee
t~iofinal walk-Aiu-u for utilities and pavinG on the referenced p,m!e~t has been scheduled for
nd,y, August 28, zvoo at 9:00 a..zm.~ ~ ~, ,g~,0,~¢,¢.~ ~ ~,~ }; ~-/
Ill can be of further assistance plea,se let me know.
cc:
Lee Stone, Commercial Inspector
Matt Petty, Blue Ridge Con~t. (fax 972-582-5180)
Dan Lenox, Scott & Reid (fax 972-774-0225)
Doland Krodell, Scott & Reid (fax 972-745-1647)
Ichn White, Kauf~nan Williams (fax 972-346-2270)
'CITY OF' COPPELL ENGINEEIUNG. EXCELLENCE BY DESIGN'*