Loading...
SS9402B-CS 970418DATE: TO: FROM: RE: April 18, 1997 Garreth Campbell COPPELL ENGINEERING UTILITIES DMSION MEMORANDUM Curtis Jordan, Public Works Walk thru for Grapevine IV A walk-thru on the above referenced project was conducted on and the items below were found to be deficient. 2. 3. 4. 5. 6. 7. 8. 9. 10. April 18, 197 Sta OT 38.07 M.H. Chimney Seal needs tightened at bottom. (invert siphontiesinto) Sm 11 + 17 rework floor where o10 8" line went in and out. Sta 26 + 00.47 crack in pavement around MH Existing MH in Northbound inside lane of Denton Tap needs plugged better. Please ensure that these items get taken care of and if you have any questions, please give me a call. MMC/dg COPP~.x.x. ENGIN~-.1NG UTrr.~.s DIVISION MEMORANDUM TO: ~o~, C~'~ w~ A w~-~ on ~e above referen~ proj~: w~ conduc~ on ~d aa imm~ below were found ~o be defident. Plea.~ ~mur~ that these items g~t mien care of and it' l~ou ~v~ any questions, ple~.s~ gve me a