ST8804-CS 911115The City With A Beautiful Future
November 15, 1991
PUBLIC WORKS
P.O. Box 478
Coppell, Texas 75019
214-462-0022
/
Mr. Bill Anderson /
Dan M. Dowdey & Associates
16250 Dallas Parkway, Suite 100
Dallas, Texas 75248-268~
Re: Final Acceptance~/-
~eartz ~Sandy Lake Road to Parkway Blvd.
Dear Mr. Anderson:
A final inspection of the above re~erenced project his been confirmed by
representatives of the City of Coppell.
Paving and utilities have been verified and are in compliance with the
City of Coppell standard requirements.
Please follow the Erosion Control Ordinance as adopted by the City of
Coppell during the maintenance bond period.
The one-year maintenance bonds and as-built drawings have been received
from the contractor. Maturity on the bonds will be one year from the date
of this letter (November 15, 1992).
Larry Davis¢~'~
Construction Inspector
CLD/bd
cc:
M. Shohre Daneshmand, Acting City Engineer
Gary L. Sieb, Director of Planning and Community Services
Howard Pafford, Water Superintendent
Rey Gonzales, Street Superintendent
Rick Wieland, Parks and Recreation Manager
Taryon Bowman, P&Z Coordinator
Ben dela Cruz, Engineer Technician
Mike Allen, Allen Property Corporation
Tom Wise, Wiseco