ST8804-CS 910903COPPELL P
DATE:
TO=
RE:
September 3, 1991
La~Y~_Dfvis:co~ruction Inspector
H~_~_ja<rd~ ~:-~;fford, ~ter Utilities Superintendent
~Hearts ROad North~alkthrough Punchllst
_/
I have asked p~r~onnel~walk through the above referenced project
to check the original punchlist. The following itoalls r~aain
deficient on the project.
1) Sta. 35+20.91 - Manhole ring needs to be reset and regrouted.
2) Sta. 0+85.00 - Valve pad needs to be repoured.
Please insure that each of these items are corrected prior to
acceptance of this project.
HLP/mp
HEARTZN.RG