MacArthur Vista-CS030701Mr. Alan Hinckley Univest Properties 12201 Merit Drive, Suite 170 Dallas, TX 75251 RE: MacArthur Vista Center, Lot 1, Block A Fee Assessment Letter July 1, 2003 Dear Mr. Hinckley: Enclosed is a copy of the City of CoppeI1 Roadway Impact Fee Calculations table. Please note that the remainder of the fees for this development cannot be calculated until construction plans are submitted showing the number and size of the water meters. Also, if the size of the building changes from what was approved at the Council Meeting additional Roadway Impact fees may be required. Please make payment for the Roadway Impact Fees to the City of Coppell in the amount of $12,020.27 and foIward to the Engineering Department along with a copy of the Roadway Impact Fee Calculations table. This amount is the portion of the required fees that need to be paid prior to Council approval. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to the scheduled pre-construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees, that will be calculated when construction plans are submitted, need to be paid by separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely,/~, Ke~eth h.l~p.E. Director of Engineering/Public Works CC~ Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell '~ Dir f lic W ~rel}~Jbn~s, ~'~i~f Building official Brad Reid, Director of Parks and Recreation ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: MacArthur Vista Center, Lot 1, Block 6/30/03 ROADWAY IMPACT FEE: Service Area * 2 2ategory ** Office Land Use ** General Office Bldg. Building Area (sf) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** i t. Roadway Impact Fee due = (Development Units) x ~Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = 10,042 10.04 3.99 $3OO $12,020.27 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)