MacArthur Vista-CS030701Mr. Alan Hinckley
Univest Properties
12201 Merit Drive, Suite 170
Dallas, TX 75251
RE: MacArthur Vista Center, Lot 1, Block A
Fee Assessment Letter
July 1, 2003
Dear Mr. Hinckley:
Enclosed is a copy of the City of CoppeI1 Roadway Impact Fee Calculations table. Please note that the
remainder of the fees for this development cannot be calculated until construction plans are submitted
showing the number and size of the water meters. Also, if the size of the building changes from what was
approved at the Council Meeting additional Roadway Impact fees may be required.
Please make payment for the Roadway Impact Fees to the City of Coppell in the amount of $12,020.27
and foIward to the Engineering Department along with a copy of the Roadway Impact Fee Calculations
table. This amount is the portion of the required fees that need to be paid prior to Council approval.
Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer
Impact Fees until the issuance of a Building Permit. Please provide a copy of the Engineer's estimate or
contract to our office so the 2% & 4% construction inspection fee can be verified. The construction
inspection fees must be paid prior to the scheduled pre-construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees, that will be
calculated when construction plans are submitted, need to be paid by separate check at the new Public
Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely,/~,
Ke~eth h.l~p.E.
Director of Engineering/Public Works
CC~
Jennifer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell '~ Dir f lic W
~rel}~Jbn~s, ~'~i~f Building official
Brad Reid, Director of Parks and Recreation
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
MacArthur Vista Center, Lot 1, Block
6/30/03
ROADWAY IMPACT FEE:
Service Area * 2
2ategory ** Office
Land Use ** General Office Bldg.
Building Area (sf)
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile *** i
t.
Roadway Impact Fee due = (Development Units) x
~Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
10,042
10.04
3.99
$3OO
$12,020.27
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)