Loading...
Lakewood Estates-CS 930303The City With A Beautiful Future March 3, 1993 P.O. Box 478 1993 /:oppe,, Texas 75019 Mr. Craig Smiley Unzicker, Schnurbusch Associates 8700 Stemmons Freeway, Suite 400 Dallas, TX 75247 Re: Lakewood Estates Tract A Final Acceptance Dear Mr. Smiley: A final inspection of the above-referenced project has been confirmed by representatives of the City of Coppell subject to the various maintenance agreements. The drainage utility and paving has been verified and is in compliance with the City of Coppell standard requirements. Erosion protection will also be maintained until bond expiration. The one-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of this letter. Maturity on the Erosion Control Bond will be two years from this letter. Sincerely, Construction Inspector CCi t/Steve Goram, Director of Public Works Kenneth M. Griffin, P.E., City Engineer M. Shohre Daneshmand, Civil Engineer Greg Jones, Acting Building Official Floyd Key, Legend Construction Dale Gilreath, Glenn Thurman, Inc. Keith Jackson Waymon Levell