Lakewood Estates-CS 920828project.
Water ~mpact Fee:
145 - 5/8" x 3/4"
Domestic Meter/s =
Irrigation Meter/s =
Fireline Meter/s
145 ESU's
ESU' s
ESU' s
Total 145 ESU's ~ $650.00 ea = $94,250.00
100% due prior to Council approval of final plat.
* Note: This calculation does not include irrigation services.
City Wastewater Impact Fee:
145 - 5/8" x 3/4" Domestic Meter/s = 145 ESU's ~ $225.00
%~3T,625100
100% due prior to Council approval of final plat.
Water Tap Inspection Fee
145 Connections ~ $100.00 each = $14,500.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
145 Connections ~ $100.00 each ~ $14,500.00
100% due prior to issuance of building permit.
UtilitI~ Final Zns~ection Fee
145 Connections ~ $50.00 each = $7,250.00
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
145 Residential Lots at
~ Units (Multi family)
$150.00 each ~ $21,750.00
at $75.00 each ~ $ N/A
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cc: Steven G. Goram, Director of Public Works
GIBBSSTA.HLP
STREET SIGN ASSESSMENT
for Lakewood Estates
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN
UNIT PRICE QUANTITY
$ 53.10 N/A
$ 63.54 19
$ 58.56 N/A
$ 65.12 N/A
$ 11.60 4
96.85 9
EXTENDED PRICE
No Parking
Speed Limit
Yield
Stop
Street Name
Stop & Street Combo $
OTHER
$1,207.26
46.40
$ 871.65
104.00
$2,229.31
Poles w/bases
and concrete
26. O0 4
TOTAL