Loading...
Magnolia Fish-CS010515T H E C I T Y 0 F May 15, 2001 William Wingo 1625 North Story Road Suite 144 Dallas, TX 75061 RE: Magnolia Fisheries Fee Assessment Letter Mr Wingo: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $1,208.40 and forward to the Engineering Department along with a copy of the Fee Assessment table. Also provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, __ Michael A. Martin, . . Assistant City Engineer Jennifer Armstrong, Finance Director Rhonda Brothers, Engineering Secretary Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEES PROJECT NAME: ENGINEER: ORIGINATION DATE: Magnolia Fisheries 5/15/01 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection 5/21/01 Roadway Impact-Zone 5/21/01 Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS 2% & 4% 5/15/01 $574.64 $1,208.40 Total Fees $1,783.04 notify street dept. $574.64 $1,208.40 Notify utility dept. when meters, taps or deposits are paid Fees Paid $1,783.04 Amount Owed $o.oo NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. DEVELOPMENT FEE TABLE Project: Magnolia Fisheries Date: 5/15/01 TOTAL FEES DUE Water Impact Fee $0.00 (100% due prior to Council Approval) Water Tap Inspection Fee $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 (100% due prior to Council Approval) Roadway Impact Fee $1,208.40 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project Street Sign Fee Information not Available (100% due prior to Acceptance of Project Construction Inspection Fee Information not Available TOTAL $1,208.40 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Magnolia Fisheries DATE: 5/15/01 ROADWAY IMPACT FEE: Service Area * 1 Sategory ** Industrial Land Use ** General Light Industrial Building Area (sf) 3,800 Development Units ** 3.80 Vehicle Miles per Developmem Unit ** 1.06 ?ee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $1,208.40 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)