Magnolia Fish-CS010515T H E C I T Y 0 F
May 15, 2001
William Wingo
1625 North Story Road
Suite 144
Dallas, TX 75061
RE: Magnolia Fisheries
Fee Assessment Letter
Mr Wingo:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of Coppell in the amount of
$1,208.40 and forward to the Engineering Department along with a copy of the Fee
Assessment table. Also provide a copy of the Engineer's estimate or contract to our office
so the 2% & 4% construction inspection fee can be verified.
Appropriate payment of the required fees will help insure a successful beginning of this
project. We look forward to working with you on this project. If you have any questions,
please contact me.
Sincerely, __
Michael A. Martin, . .
Assistant City Engineer
Jennifer Armstrong, Finance Director
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEES
PROJECT NAME:
ENGINEER:
ORIGINATION DATE:
Magnolia Fisheries
5/15/01
SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE
Park Fee
Water Impact Fee
Wastewater Impact Fee
Street Sign
Street Light
Construction Inspection 5/21/01
Roadway Impact-Zone 5/21/01
Street Cut Permit
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
TOTALS
2% & 4%
5/15/01
$574.64
$1,208.40
Total Fees
$1,783.04
notify street dept.
$574.64
$1,208.40
Notify utility dept.
when meters, taps
or deposits are paid
Fees Paid
$1,783.04
Amount Owed
$o.oo
NOTES
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.
DEVELOPMENT FEE TABLE
Project: Magnolia Fisheries
Date: 5/15/01
TOTAL
FEES DUE
Water Impact Fee $0.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $1,208.40
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project
Construction Inspection Fee Information not Available
TOTAL $1,208.40
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Magnolia Fisheries
DATE: 5/15/01
ROADWAY IMPACT FEE:
Service Area * 1
Sategory ** Industrial
Land Use ** General Light Industrial
Building Area (sf) 3,800
Development Units ** 3.80
Vehicle Miles per Developmem Unit ** 1.06
?ee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $1,208.40
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)