ST9302-CN000509 , : AGENDA RE., UEST FORM CITY COUNCIL MEETING: May 9, 2000 ITEM # __~ ITEM CAPTION: Consider approval of Change Order #5 to the Sandy Lake Road Project #ST 93-02 for the extension of Sandy Lake Road through the MacArthur Blvd. intersection in the amount of $1,211,687.07 to Ed Bell Construction Company; and authorizing the Mayor to sign. SUBMITTED~E. TITLE.~ Director of En~e_~l:ifig/Public Works STAFF COMM . Clr¥ COUncil See attached memo. BUDGET AMT. $ AMT. EST. $ +k-BID $ FINANCIAL COMMENTS: Funds for this contract are available from the 1999 Street CIP Bond Issue and Interest Earnings on the CIP funds. DIR. INITIALS: ~'7 FIN. REVIEW: ~ Agenda Request Form - Revised 2/99 CITY MANAGER REVIEW: Document Name: #0409001 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: From: Date: RE: Mayor and City Council Kenneth M. Griff'm, P.E., Director of En~neering/Public Works }~/ May 9, 2000 Consider approval of Change Order #5 to the Sandy Lake Road Project #ST 93-02 for the extension of Sandy Lake road through the MacArthur Blvd. intersection in the amount of $1,211,687.07 to Ed Bell Construction Company; and authorizing the Mayor to sign. Summary: Staff has always anticipated a large change order to this project; · This intersection was not initially included with the City's section of Sandy Lake Road because it was included with Dallas County's section which was approximately 9 to 12 months ahead of our design contract; and · It's better to work with one contractor on the entire project for resolution of any current or future issues. In 1993 the City began the process of selecting an engineering firm to design Sandy Lake Road from Denton Tap to MacArthur Blvd. In mid-1992, Dallas County had selected a firm to design Sandy Lake Road from MacArthur Blvd. to the east city limits. Because the County project was initiated prior to our project, their project included the design and construction of the MacArthur/Sandy Lake intersection to approximately 300 feet west of MacArthur Blvd. That point is directly in front of the Kroger Food Store at the northwest comer of MacArthur and Sandy Lake Road. It became apparent several years ago that our project would track ahead of the County project. This created a dilemma on the timetable to construct the MacArthur/Sandy Lake intersection. I made inquiries to Dallas County about the feasibility of breaking out the design of the MacArthur/Sandy Lake intersection and constructing it as a separate project to the overall County project. After numerous discussions, Dallas County agreed to breakout the design of the MacArthur/Sandy Lake intersection from 300 feet west of MacArthur Blvd. to approximately Kimbel Court. This allows the construction of the entire intersection with mm lanes in both directions. It also allows for the construction of improved traffic signals at the intersection so that we can better facilitate traffic movements in all directions through the intersection. The design was not complete and available at the time we bid the City's section of Sandy Lake Road. However, during the bidding process all perspective bidders were informed that there was a strong possibility that a major change order would "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" be forth coming at some time during the construction of the project that would involve the construction of the MacArthur/Sandy Lake intersection up to approximately Kimbel Court. In September 1999, the City received 95% complete plans from Dallas County on the improvements through the MacArthur/Sandy Lake intersection. Several options were available to the City. One was to totally complete the plans, generate a set of specifications and then put the project out to bid. This had several drawbacks: 1) The actual timing of the completion of the plans and specifications; and 2) Our current contractor is constructing water lines through the MacArthur intersection and with two contractors working specifically within the intersection there could be problems in the future with neither contractor taking responsibility if something failed within the intersection. A second option was to issue a change order to the Sandy Lake Road project. Therefore, we contacted the current contractor on the project, Ed Bell Construction, provided him a set of the 95% complete plans and asked for a quote on a change order to the project. Our thoughts on this process was that with one contractor working within the intersection there would be only one point of contact for any conflict or future problems. This makes for a much smoother operation. I had anticipated a large change order several years ago however, since that time construction prices have risen, plus the work involved with the entire change order is in a high volume intersection. This will create traffic control and constructability issues. There are over 20,000 vehicles a day on MacArthur and approximately 15,000 vehicles a day on Sandy Lake at this intersection. To maintain movement of traffic through the intersection, the contractor will need a minimum of four separate and distinct move-ins within the intersection and potentially six. This will allow the contractor to maintain at least one lane of traffic in all directions while working within the intersection. Needless to say, work within the MacArthur/Sandy Lake intersection will worsen an already overloaded intersection. If Council approves this change order, I have asked the contractor to direct as much activity within the MacArthur intersection as possible during the summer months. However, before the contractor can even make that commitment, there are other issues associated with the construction of Coppell's 30" water line and the lowering of the Dallas water line that need to be resolved. Staff recommends the award of Change Order #5 to Ed Bell Construction Company in the amount of $1,211,687.07 for the continuation of Sandy Lake from approximately 300 feet west of MacArthur to approximately Kimbel Court. Staffwill be available to answer any questions at the Council meeting. "CITY OF COPPELL ENGINEERING - F_~XCELLENCE BY DESIGN" CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: CONTRACTOR: 0 WNER: CHANGE ORDER: SANDY LAKE ROAD PROJECT # ST 93-02 ED BELL CONSTRUCTION COMPANY CITY OF COPPELL #5 DATE: 519100 MacArthur Boulevard Intersection Improvements Item #, quantity, unit, description and prices listed on attached page. TOTAL Addition I TOTAL CItANGE ORDER #5 Tota/Pr~e I$1,211,687.07 $1,211,687.07 Previous Contract Amount Total Change Order #$ Revised Contract Amount Net Increase in Contract Time of Completion Revised Contract Time of Completion $8,729,122.30 1,211,687.07 $9,940,809.37 120 Days 1041 Days The contractor hereby accepts this contract adjustment as a f'mal and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the C:ct bY reas:n~r 7ievisi°n t° the C°ntract' Accepted]~ ~wner ' R'ecomme~.,by C)~y Engmeer Agr ~~b~ ~~tor Date Date MACARTHUR BOULEVARD INTERSECTION IMPROVEMENTS ITEM DESCRIPTION UNIT QUANTITY PRICE EXYE. NSION 1 Mobilization LS 1.00 $226,000.00 $226,000.00 2 ROW Preparation LS 1.00 S50,000.00 $60,000.00 3 Field Office LS 1.00 $10,000.00 $10,000.0(~ 4 Rem Concrete and HMAC SY 6,207.00 $4.00 $24,828.0(3 5 Rem Concrete Curb LF 1,267.00 $2.50 $3,167.50 6 Rem Headwall EA 4.00 $500.00 $2,(XX).00 7 'Rem Existinc~l RCP LF 426.00 $10.00 $4,260.00 8 Rem Guardrail LF 90.00 $10.00 $900.00 9 Rem Concrete Flumes LF 69.0~ $50.00 $3,450.00 10 Rem Brick/Stone Wall LF 530.00 $10.0~ $5,300.00 11 Rem Electrical Box EA 2.00 $200.00 $400.00 12 Rem Grate Inlet EA 1.00 $500.00 $500.00 13 Unclassified Street Excavation CY 7,513.00 $3.00 $22,539.00 14 8' Limed Sub~rade SY 9,502.00 $'i.35 $12,827.70 15 Hydrated Lime TN 185.00 $85.00 $15,725.00 16 8' Concrete Pavement SY 6,449.00 $24.88 $160,451.12 17 6' Concrete Curb LF 3,202.00 $1.50 $4,803.00; 18 2' 'FY D HMAC Transition SY 898.00 NO BID NO BID 19 6' HMAC Transition Pavement SY 931.00 $30.00 $27,930.00 20 6' TY D HMAC Curb LF 259.00 $15.00 $3,885.00 21 4' Concrete Sidewalk SY 298.00 $20.00 $5,960.00 22 Concrete Pavers SY 2,165.00 $58.00 $125,570.00 23 :Concrete Driveways SY 356.00 $30.00 $10,680.00 24 HMAC Driveways SY 156.00 $50.00 $7,900.00 25 Concrete Header LF 100.00 $15.00i $1,500.00 26 Metal Beam Guardrail LF 75.00 $20.00 $1,500.00 27 Laydown Terminal EA 1.00 $1,100.00 $1,100.00 28 18' CL III RCP LF 436.00 $32.00 $13,952.00 29 21' CL III RCP LF 129.00 $35.00 $4,515.00 30 24" CL III RCP LF 232.00 $41.00 $9,512.00 31 27' CL III RCP LF 138.00 $46.00 $6,348.00 32 33' CL III RCP LF 122.00 $50.00 $7,320.00 33 10' PVC Sewer LF 20.00 $48.00 $950.00 34 21' PVC Sewer LF 548.00 $140.00 $76,720.00 35 Recessed 6' Curb Inlet EA 2.00 $1,700.00 $3,400.00 36 Recessed 6' Curb Inlet EA 2.00 $2,000.00 $4,000.00 37 Recessed 10' Curb Inlet FA. 1.00 $2,100.00 $2,100.00 38 Recessed 14' Curb Inlet EA 1.0( $3,000.00 $3,000.00 39 Standard 10~ Curb Inlet EA ZOO $2,100.00i $4,200.00 40 Standard Y Inlet (3 sidesI EA 2.00 $2,200.00! $4,400.00 41 Standard 6' TY A Storm Drain Manhole EA 2.00 $2,000.00 $4,000.00 42 Standard Manhole Extra Depth 1>6') EA 5.00 $150.00 $750.00 43 Standard Sanitary Sewer Manhole (6') EA 4.00 $1,500.00 $6,000.00 44 Sanitary Manhole Extra Depth (>6') EA 10.00 $150.00 $1,500.00 45 24' T~ C Headwall EA 1.00 $2,000.00 $2,000.00 46 33' TY C Headwall EA 1.00 $2,500.00 $2,500.00 47 Adjust Existir~ Sanitary Sewer Manhole EA 4.00 $850.00 $3,400.00 48 Adiust Exiisfir~ Water Meter Valve Boxes EA 10.00 $120.00 $1,200.00 49 Traffic S~nal Installation - Mac. Arthur Blvd. LS 1.00 $210,000.00 $210,000.0~ 50 2' PVC Conduit (Direct Buried) LF 850.00 $3.50 $2,975.00 51 30'-0" Sq Painted Pole w/2-250 W HPS Fixtures & Foundation EA 4.00 NO BID NO BID 52 Temporary Roadway LS 1.00 $50,000.00 $50,000.00 53 4' Topsoil SY 3,669.00 $2.50 $9,172.50 54 H ;dromulch SY 3,669.00 $1.25 $4,586.25 55 Storm Water Prevention Plan (SWPPP) LS 1.0~ $12,500.00 $12,500.00 Pavement Markings LS 1.0{3 $17,500.00 $17,500.00 TOTAL $1,211,687.07 · FA~ (2~1.) 352-3201 ""~ TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 May 23, 2000 Mr. Kenneth M. Griffin, p.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: Enclosed for your review and incorporation into the contract are three executed copies of change order #5. If you have any questions regarding this change order, don't hesitate to contact our office. Sincerely, ~i~wSe be r~C°mp,any' Project Engineer Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER