RE: Magnolia Village, Lot I, Blk. A (revised)
Fee Assessment Letter
August 16, 2001
Mr. Pittman:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with
a copy of the Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of Coppell in the amount of
$19 125.00 and forward to the Engineering Department along with a copy of the Fee
Assessment table. This amount is a portion of the assessed fees that need to be paid prior
to Council approval. Also provide a copy of the Engineer's estimate or contract to our
office so the 2% & 4% construction inspection fee cnn be verified.
The additional fees for water and sewer taps, water meters, and utility inspection fees
need to be paid by separate check at the Public Works Service Center, 732 Deforest.
Meters will be ordered when these fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this
project. We look forward to working with you on this project. If you have nny questions,
please contact me.
Sincerely,/~
Kenneth M. (3riffin, P.E.
Director of Engineering & Public Works
cc:
Jennifer Armstrong, Finnnce Director
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: Magnolia Village Lot I Blk A (revised)
Date: 8/16/2001
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $11,925.00 $11,925.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $200.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $378.74
(100% due at Issuance of Water Meter)
Water Meter Fee (IrrigationfFireline) $2,346.75
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $70.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $7,200.00 $7,200.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Street Light Fee [nformation not Available
(100% due prior to Acceptance of Project II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project II
Construction Inspection Fee Information not Available
II
TOTAL $22,380.49
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $19,125.00
PROJECT:
DATE:
ROADWAY IMPACT FEE CALCULATIONS
Magnolia Village Lot 1 BIk .4 (revised)
8/16/2001
ROADWAY IMPACT FEE:
Cater* ~ 1
Land Use____._._~** ~ Commercial
~ Sho in Center
~t Units ** 15,600
4.77
~~$3 O0
= t evelopment Units) x ~
(Vehicle Miles er Develo ment Unit) x Fee r Vehicle Mile -- .
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
Total Credit per Developers Agreement Dated January 31,2001 $22,323.60
AMOUNT DUE:
$0.00 ~
Available credit for future development on the original 10 acre site
is $1112.40 ($23,436 - $22,323.60 = $1112.40)
· D C)PM NT FEE WORY EET
DQmedicMei~l): 2 - 2 inch - 16 ESU's
~rdl~Sim Mew(s): ~ - 2 ~ _= 8 ,. ESU's
- 0 ESU's
Firidtrte. Me~(s): I - ~ inch = 2.5 ESU's
TotalS. 2L6 ESU'B ~ ~1,~0.00 e~.
Water Tap Inspectkm ~'ee:
$11~925.00
Domlsde Water Miler Fee:
TOtal ~. 2 Dofl~stic Ide~r(s) ~ S189.37
(N~ omer dev~ol)mmm due pdQr to issuance of meter)
$378.74
Water Meter Fee:
Tom~. 'l ~rde~on
i)omNmie Water,Miter I)epoait Fro:
Toad ~ 2 Meier(s) G S,~5;00 ~a.
Irr~~ Md~r Dq~it Fee:
To~ ~. 2 Me~(s) ~t $30.00 sa.
· $70.00
Talll OomeM~ ~ ESU's:
16 O s, mo.oo es. $7~oo.oo
Wlltewlter Tap llmpedt°ia F2ee: Commeljo~ O $50.00 ee' Tall ·
S100.00
U~ lPmal ~ Fee (All devdopmems):
$100.00
Page1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved:
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
$0.00
$0.00
$0.00
Information not Available
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available