June 2g, 2001
T~d Pittman
SCI D~mn TRD, Ltd.
11-551 Fo~t ~ Drive, Suite 304
~ TX 75243
RE: IViagno i, nik A
F~ As~es~m~ut Letm / REVISED
Mr. Pittman:
EnClosed is a copy of the City of Copl~eil Development :Fee Assessment table, along with a copy of the
Development Fee ~.alculations for the geferenced development.
Please make payment for the ~ Fee~ to the City of Colwell in the amount of ~ and
forward to the~~ Dep~im~mt nlong with a copy of ~ F~e A,q~e~a~mt table. This amount is
a portion of ti~ n~ fees that need to be ~ prior to Council app~vnl. Also, p~vide a copy of
~e Engineers estimate or c, onu~t toour office so the2% and 4% ~n impection fee can be
verified.
The additional fe~s for water and sewer taps, water meters and utility ~on fees need to be paid by
separn~ check at the Public Works Se~ice Center, 732 Deforest Road. Metes will be ordered when
Appropriate pnyment of the t~luLred fees will help insu~ a successful beginning of this project. We
look forward to workin~ with you on this project ffyou have any questions please call 972/304-3679.
Sincerely,/'~
~ M. O~iffin, P.E.
Direetor of En~g and Public Works
Jennifer Armstrong, Finance Director
DEVELOPMENT IrEE TABLE
Project: ,~i~oab V'a/qe Lot I ~ttcA
I~te: O'2sa$01
lr~E8 I}UE PRIOR TO
COUNCIL
, APPROVAL
Water L, nPact Fee $11,925.00 $11,925.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $250.00
(100% due at Issuance of Water Meter}
Wa~r Meter Fee (Domestic) $378.74
000% due at Izsuance o£Water Meter)
Water Meter Foe (IrrigationfFimlin~) $4,~04.13
(10o~ due at l~uance of Water Meter)
Water'Meter D~t (Domestic) $70.00
00o% due ~t ~uance of Water Meter)
Irrigation/FLrelim Me,er Deposit $90.00
( 100% due at Issuance of Water Meter)
Was~water Impact Fee $7,200.00 $7,200.00
(100% due prior to Council Approval)
Wastcwater Tap Inspection Foe $100.00
(100% due at Issuance of Buildin$ Permit~)
Utility Final lnapection Foe $100.00
(100% due at Issuance of Buildin$ Permit~
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00 $0.00
(100%,due prior to Council Approval)
Street Light Fee [nformmion not Available
(100% due prior to Acceptance of Project
Street Sign Fee Information not Available
0o0% due Flor to Accepmce of Project
Construction Inspection Fee Information not Available
TOTAL $24,617.87
T,OTAL AI~,~ 0UE I~RIOR ~O COUI~CIL AI*I'ROV~ $19,125.00
DEVELOPMENT FEE W~EET
PROJ~T: M~g~ol~ Fill~e Lot l
DATE:
Water Impact Fee:
h'~gaSon
Firellne Idete~(s):
2 - 2 tnGh = 16 E~J's
I - 2 ~ = 8 ESU'$
0 = 0 ESU's
" 2-8~ = 2.5 ' ~SU's
Total #: 26.5 ESU's 0 $460.00 ea.
(1~0% due prior to Couflcii approval of the final plat)
Water Tap Inspection Fee:
(~a~lk) family dUe i~lor ID i~uance of~ pemlit)
(M other deCo;men= due pax ~ ~ of rm~er)
Domesfle Water Meter Fee:
Total #: 2 DomeMic MeMr(s) ~} $189.37
(Singb~ f~mily due prior to is~um~ce of building peffnlt)
lrripdu~Jreline WaUr Meter Fee:
To~; ~. 1 Irr~uc~ Meter(s} ~
TotaJ ~ ,0 Ad~tJonaJ I~ MeMr(s):~
TotalS. ~ FirolJneMMM(s)~
(100% due prior to issuance of water meters)
Domestie Water Meter D~po~it Fee:
To~#: ~2 MeUr(s) O $3S.00 ea.
(l~ue prior 1o issuance of water metem)
Irription/Fire Meter Deposit Fee:
TOtal:#; 3 Meter(s) ~ $30.00
(100% due prior to bsuance of waMr metom)
Wa~eWa~r Impaet Fe~:
Total Domast~ Mamm E~U's:
16 Q $460.oo ea.
Wastewater Tap lnapmgtiom Fee:
Total#: ~2 Com~::~ls ~ S50.00 ea.
Utility Final Inspection Fee (~Ai developmenb):
Total#: ~2 LOIS ~ ~S0.00 ea.
(1~% eae p~ to mus~ce o~ ~iMlng,pem~)
$11,925.00
$250.00
$378.74
$189.37
$0.00
$4,314.76
$70.00
$90.00
$L200.00
$100.00
$100.00
Residential Develepmeats Only):
Paoel
DEVELOPMENTFEEWORKSJ. IEET
0
0
(50% paid pdor to Council 8pprovBI of final plat)
(~0% j~ct at inure'ce of t:xddlng pem~)
Romlwey Imp~.t lee:
(Gee ~
S4reet Lighting Fees:
Asoemed for lighting in the City's right.of-way.
This hm Cannot be osseued u6tff 8~r T.U. Bect~ ~
(~00%dUO prior to mm aceopUnce o~dev~mme~)
Information not Available
Assemed for sigrmge in the CWs rJgl~of, way.
(See mtached fee calculations I~ applicable)
Inf~'m~i~n n~ Available
Construction Inspection Fees:
A copy of ~e development conlract must be submitted for aese~ment.
l~t ~m in~l~:l~ by 11~ E~gin~ln~ D~ln,~.~.
(2% of development cost requirod for privute improvements)
(4% of development cost requit~ld for public improvemefl~s)
Information not Available
ROADWAY IMPACT FEE C~TIONS
DATE:
ao~uws~:~m, sc~ Itt,
due- ~ent ~nb) x
* (Figure 2 - Rcmdway Iml~'t Fee Study)
** (Table 3 - Ronch~y Impact Fee Study)
*** (Schedule 2, Page 3 - Roldway Impact Fee Study)
Total Credit per Developers Agreement Dated January 31,200 $22,323.60
Avnilable credit f~ future development on the original 10 8cre site
is S1112.40 (S23,436 - $22,323.60 = SI 112.40)