Loading...
Magnolia Village-CS010628T H · T Y * 0 If June 2g, 2001 T~d Pittman SCI D~mn TRD, Ltd. 11-551 Fo~t ~ Drive, Suite 304 ~ TX 75243 RE: IViagno i, nik A F~ As~es~m~ut Letm / REVISED Mr. Pittman: EnClosed is a copy of the City of Copl~eil Development :Fee Assessment table, along with a copy of the Development Fee ~.alculations for the geferenced development. Please make payment for the ~ Fee~ to the City of Colwell in the amount of ~ and forward to the~~ Dep~im~mt nlong with a copy of ~ F~e A,q~e~a~mt table. This amount is a portion of ti~ n~ fees that need to be ~ prior to Council app~vnl. Also, p~vide a copy of ~e Engineers estimate or c, onu~t toour office so the2% and 4% ~n impection fee can be verified. The additional fe~s for water and sewer taps, water meters and utility ~on fees need to be paid by separn~ check at the Public Works Se~ice Center, 732 Deforest Road. Metes will be ordered when Appropriate pnyment of the t~luLred fees will help insu~ a successful beginning of this project. We look forward to workin~ with you on this project ffyou have any questions please call 972/304-3679. Sincerely,/'~ ~ M. O~iffin, P.E. Direetor of En~g and Public Works Jennifer Armstrong, Finance Director DEVELOPMENT IrEE TABLE Project: ,~i~oab V'a/qe Lot I ~ttcA I~te: O'2sa$01 lr~E8 I}UE PRIOR TO COUNCIL , APPROVAL Water L, nPact Fee $11,925.00 $11,925.00 (100% due prior to Council Approval) Water Tap Inspection Fee $250.00 (100% due at Issuance of Water Meter} Wa~r Meter Fee (Domestic) $378.74 000% due at Izsuance o£Water Meter) Water Meter Foe (IrrigationfFimlin~) $4,~04.13 (10o~ due at l~uance of Water Meter) Water'Meter D~t (Domestic) $70.00 00o% due ~t ~uance of Water Meter) Irrigation/FLrelim Me,er Deposit $90.00 ( 100% due at Issuance of Water Meter) Was~water Impact Fee $7,200.00 $7,200.00 (100% due prior to Council Approval) Wastcwater Tap Inspection Foe $100.00 (100% due at Issuance of Buildin$ Permit~) Utility Final lnapection Foe $100.00 (100% due at Issuance of Buildin$ Permit~ Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100%,due prior to Council Approval) Street Light Fee [nformmion not Available (100% due prior to Acceptance of Project Street Sign Fee Information not Available 0o0% due Flor to Accepmce of Project Construction Inspection Fee Information not Available TOTAL $24,617.87 T,OTAL AI~,~ 0UE I~RIOR ~O COUI~CIL AI*I'ROV~ $19,125.00 DEVELOPMENT FEE W~EET PROJ~T: M~g~ol~ Fill~e Lot l DATE: Water Impact Fee: h'~gaSon Firellne Idete~(s): 2 - 2 tnGh = 16 E~J's I - 2 ~ = 8 ESU'$ 0 = 0 ESU's " 2-8~ = 2.5 ' ~SU's Total #: 26.5 ESU's 0 $460.00 ea. (1~0% due prior to Couflcii approval of the final plat) Water Tap Inspection Fee: (~a~lk) family dUe i~lor ID i~uance of~ pemlit) (M other deCo;men= due pax ~ ~ of rm~er) Domesfle Water Meter Fee: Total #: 2 DomeMic MeMr(s) ~} $189.37 (Singb~ f~mily due prior to is~um~ce of building peffnlt) lrripdu~Jreline WaUr Meter Fee: To~; ~. 1 Irr~uc~ Meter(s} ~ TotaJ ~ ,0 Ad~tJonaJ I~ MeMr(s):~ TotalS. ~ FirolJneMMM(s)~ (100% due prior to issuance of water meters) Domestie Water Meter D~po~it Fee: To~#: ~2 MeUr(s) O $3S.00 ea. (l~ue prior 1o issuance of water metem) Irription/Fire Meter Deposit Fee: TOtal:#; 3 Meter(s) ~ $30.00 (100% due prior to bsuance of waMr metom) Wa~eWa~r Impaet Fe~: Total Domast~ Mamm E~U's: 16 Q $460.oo ea. Wastewater Tap lnapmgtiom Fee: Total#: ~2 Com~::~ls ~ S50.00 ea. Utility Final Inspection Fee (~Ai developmenb): Total#: ~2 LOIS ~ ~S0.00 ea. (1~% eae p~ to mus~ce o~ ~iMlng,pem~) $11,925.00 $250.00 $378.74 $189.37 $0.00 $4,314.76 $70.00 $90.00 $L200.00 $100.00 $100.00 Residential Develepmeats Only): Paoel DEVELOPMENTFEEWORKSJ. IEET 0 0 (50% paid pdor to Council 8pprovBI of final plat) (~0% j~ct at inure'ce of t:xddlng pem~) Romlwey Imp~.t lee: (Gee ~ S4reet Lighting Fees: Asoemed for lighting in the City's right.of-way. This hm Cannot be osseued u6tff 8~r T.U. Bect~ ~ (~00%dUO prior to mm aceopUnce o~dev~mme~) Information not Available Assemed for sigrmge in the CWs rJgl~of, way. (See mtached fee calculations I~ applicable) Inf~'m~i~n n~ Available Construction Inspection Fees: A copy of ~e development conlract must be submitted for aese~ment. l~t ~m in~l~:l~ by 11~ E~gin~ln~ D~ln,~.~. (2% of development cost requirod for privute improvements) (4% of development cost requit~ld for public improvemefl~s) Information not Available ROADWAY IMPACT FEE C~TIONS DATE: ao~uws~:~m, sc~ Itt, due- ~ent ~nb) x * (Figure 2 - Rcmdway Iml~'t Fee Study) ** (Table 3 - Ronch~y Impact Fee Study) *** (Schedule 2, Page 3 - Roldway Impact Fee Study) Total Credit per Developers Agreement Dated January 31,200 $22,323.60 Avnilable credit f~ future development on the original 10 8cre site is S1112.40 (S23,436 - $22,323.60 = SI 112.40)