Loading...
Magnolia Village-CS010618DEVELOPMENT FEES SENT 6/I8/01 6/18/01 7/11/01 ASSESSMENT Park Fee Water Impact Fee Wastewater impact Fee Street Sign Street Light Construction Inspection Roadway Impact-Zone Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS ASSESSED FEE $11,925.00 $7,200.00 $4,870,44 $200.00 $100.00 $378.74 $2,346.75 $70.00 $6O.OO $100.00 Total Fees $27,250.93 AMOUNT PAID DATE $11,925.00 6/28/01 $7,200.00 6/28/01 noti~ street dept. $4,870.44 7/11/01 $50.00 9/19/01 $2,157.38 9/19/01 $30.00 9/19/01 Fees Paid Amount Owed $26,232.82 $1,018.11 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. DEVELOPMENT FEES PROJECT NAME: ENGINEER: ON DATE: SENT ASSESSMENT Park Fee 6/18/01 Water Impact Fee 6/18/01 Wastewater Impact Fee Street Sign Street Light Construction Inspection Roadway Impact.Zone Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/lrri§) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS Magnolia Village, Lot i BIk A 6/18/01 ASSESSED FEE AMOUNT PAID $11,925.00 $7,200.00 $11,925.00 $7,200.00 notify street dept. $250.00 $100.00 $378.74 $4,504.13 $70.00 $90.00 $100.00 Total Fees $24,617.87 Notify utility dept. when meters, taps or deposits are paid Fees Paid $19,125.00 DATE 6/28/01 6/28/01 Amount Owed $5,492.87 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.