Loading...
ST8804-CS 910308COPPELL PUBLIC WORKS March 8, 1991 Steven G. Goram, Director of Public Works Rey Gonzales, Street Superintenden~ Heartz Rd North; Parkway Blvd., Curb Replacement Tickler 3-4-91 The paving contractor is going to replace the curbs on Parkway Boulevard at no cost. The contractor should be on sight in 30 to 45 days. Next status 4/8/91 RG/mp HEAR TZ. RG