ST8804-CS 901004DAT],::
TO:
FROi'.I:
October
Construction Permit
COPl>I!:Lll. IqHILI(; WORKS
1990 eL//
,/
l!' kle
Construct.'_on I'ee:; J!o~~hxllea:rtz Road
Fees
$600,000 Construction cost x 2% = $12,000.00
100% Due at time of pre-construction conference.
of Sandy Lake
.[}i¢~rt~t Liqht Assessment
$292.60 per light for every
You are being a:;sessed
to [I. 4 lights.
$292.60 x 14 lights =
100% Due prior to acceptance of
200 feet of roadway.
for 2858 feet of roadway, which
$4,096.40
Street Construction
totals
SIGN Iq '~ PR'I('I' .QUANTITY
NO Parking $b3. I 0 0
Speed Limit 63.5,l 2
Yield 58.56 0
Stop 65. ] 2 0
S Lreet Name ] .I.. 6 ~) 0
Stop & Street Combo 96.[i5 2
Total
1.00% Due prior to acceptance el Ski:eel Construction.
X-PI!.NDL D ]?RICI~
127.00
].93.70
320. 18
Larry I)avi:;, l~.bl.i(: ¥;,,l'k:; lil:;i)l!(:t.¢~I