ST8804-CS 891109dP Jerry Parch Consulting Engineers
e 9 19 9
N ovemb r , '8, _ _-~ ~
Mr. Russe /D~o~y/l~e, P.E.
P O Bof 478 lUU~
CODD~, ~xa, 75019
Sewer an~~ans, Coppell, Texas
Dear Russell:
Enclosed are six copies of construction plans for paving, water,
sanitary sewer and storm drainage improvements associated with
the construction of Heartz Road from Sandy Lake Road to Parkway
Boulevard. These plans were approved previously by the City in
June, 1989.
Please stamp and sign the cover sheet, retain sets required by
the City, and contact us so that we may pick up the remaining
sets for our use. Thank you.
Sincerel~
~rr~y Pa/r~/P.E.
JP:ch
Enclosures: As Noted
320 %Vestway Place, Suite 501 · Arlington, Texas 760i8 · Metro (817) 467-2418 · (817) 465-0259