Loading...
Lakewood Estates-PT 940408City of Coppell - Public Works Department oate: H / Pezmit Issued To: Name: Address: Phone: ~mergency Phone: Representing: T~pe of Work/General Description: Location of Work: IIave ~11 City and/or Franchise utilities Been Contacted and Existinq Utilities Located: ~ YES NO Will IC Be Necessary to Excavate Street, Alley or Sidewalk Pavement? Y~S (attach permit) / NO Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by. the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work. Any excavation requiring closing of a street or alley must be reported to =he Police, Fire, and Public Works Departments prior to closing (462-1144, 462-1133 and 462-8495). Attach Work Order (Franchise Only) PAGE 2 PERMIT Barricading/Detour Plan if a lane or street closure is apglicable. . fan'tractor RePresen=anive Franchise Inspector/or C£ty Inspector Date Applicant shall indemnify and forever hold harmless agains~ each and eve=-.; claim, demand or cause of action that may be made or come against it by reason of or if any way arisinq out of the closure, blockinq, excavating, cutting, ~unneling, or other work by the applicant under permit from the City, if such permit is granted. P ER~HIT. PIIB All contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project. * NO WETBORBS~T.?~Y~!