Loading...
Lakewood Estates-PT 930719Bore/Excavation in Public Right-Of-Way Permit City of Coppell Date: ~ / /4/ 73 Permit Issued To: Name: Address: - Public Works Department Project N~me: ~~~-~ Phone: Emergency Phone: ~Q/ Representing: Ty~e of Work/General Description: Location of work: TIave A~i City and/or Franchise utilities Been Contacted and Existing utilities Located: ~~YES NO Will It Be Necessary to Excavate Street, ~lley or sidewalk Pavement7 ~ YES (attach permit) NO Representative(s) of the Franchise/Co~tra~or m~st_adhe~ t~=~ construction standards approved by. the c~ty o: Coppe~, wn~u~ includes but is not limited to. Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic affected must be restored to as good Control Devices. Area(s) condition as before the commencement of work. Any excavation requiring closing of a street reported to the Police, Fire, and Public Works to closing (462-1144, 462-1133 and 462-8495). At=ach Work Order (Franchise Only) or alley must be Departments prior PAGE 2 PERMIT Attach Barricading/Detour Plan if a lane or street closure is applicable. Franckise/Contractor Representative Date eInspect°r Date Dat~ Applicant shall indemnify and forever hold harmless against each and every claim, demand or cause of action ~hat may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. PERMIT. PHB All contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project. .... '" ,~.. ...-LONE STAR GAS COMPANY Co. No.~ MAP SHEET I# 4, ~,IMMAI~y OF PIPELINE CHANGES IN DIETRIBUTION PLAN11 La~r- .~. '~. WAREHOUSE NEW INSTALLATION Jr6" ,.I'7 ,Lc' o+ooz b~¢.J~ Original ER No. or Date of IMt. llatlon fc~ replmeemJnt and re~res~ent projlctJ on~y: