Loading...
Mansions Phase 2-CS 980602COPPELL, TEXAS 75019 PO. Box 478 CoppelL Texas 75019 972-462-OO22 Rick Simmol~ Western Rim Investors~ L.C.C. P.O. Box 426 Colleyvffie~ TX 76034 Mansions by the Lake, Phase H Development Fee Assessment Dear M Simmons: June 2, 1998 Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell ia the amount of $237,888.00 and forward to the Finance Deparbaent along with a copy of the Fee Assessment'table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providiag a copy of your paid receipt to the Engineering Depa~iment will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Michael A. Martin, P.E. Assistant City Engiaeer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services D~ VELOPMENT FEE TABL~ Project: Mansions by the Lake, Phase II Date: 6/2/98 Water Impact Fee (100 % due prior to Council Approval) Water Tap Inspection Fee (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) (I00 % due at Issuance of Water Meter' Irrigation/Fireline Meter Deposit (100% due at Issuance of Water Meter) Wastewater Impact Fee (100 % due prior to Council Approval) Wastewater Tap Inspection Fee (100% due at Issuance of Building Permil Utility Final Inspection Fee (100% due at Issuance of Building Permit Park Fee (100% due prior to Council Approval) Roadway Impact Fee (100% due prior to Council Approval) Street Light Fee (100% due prior to Acceptance of Project Street Sign Fee ~ (100% due prior to Acceptance of Project Construction Inspection Fee TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL $0.00 $0.0o ~' $o.oo $161,910.00 $161,910.00 ~ $75 $237,888.00 DE, ELOPMENT FEE WORKSHEE. f PROJECT Mansions by the Lake, Phase H DATE: 6/2/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 0 = 0 ESU's 0 = 0 ESU's = ESU's = 0 ESU's Total #:. 0 ESU's @ $450.00 ea. * $0.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. $0.00 (Single family due prior to issuance of building permit) (All other developments due pdor to issuance of meter) Water Meter Fee (Domestic): Total #: 0 Domestic Meter(s) @ * $0.00 (Single family due prior to issuance of building permit) " (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/FireHne): Total #: ...0 irrigation Meter(s) @ $0.00 Total #: . 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 0 Meter(s) @ $35.00 ea. $0.00 ~ 00% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. $0.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ES 0 @ $450.00 ea. * $0.00 Page 1 Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. $0.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ail developments): Total #: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $0.00 * Water meters were purchased with Mansions by the Lake, Phase I DE. ELOPMENT FEE WORKSHE= f Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: 0 0 Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: 0 0 Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 0 126 Roadway Impact Fee: Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) (See attached fee calculations) Street Lighting Fees: Assessed for ~ighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0,00 $0.00 $0.00 $0.00 $0.00 $161,910.00 $75,978.00 Information not available at ~his time Street Sign Fees: Assessed for signage in the Cibj's right-of-way. (See attached fee calculations if applicable) Information not . available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department, (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of devclopmem contracts Page 2 ROAD, ¢ AY IMPACT FEE CALCULA~I ~ONS PROJECT: DATE: Mansions by the Lake, Phase H 6/2/98 ROADWAY IMPACT FEIZ,~ Service Area * Category ** Land Use ** Building Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** ~oadway Impact Fee due = (Development Units) x Residential Multi-Family N/A -- 126 2.01 $3OO * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)