Mansions Phase 1-CS 971122Rick Simmon~
Western Rim Investors, L.C.C.
P.O. Box 426
Coileyville, TX 76034
The Mansions By The Lake ('Phrase 1)
Development Fee Assessment
Dear Mr. Simmons:
P.O. Box 478
Coppell, Texas 75019
214-462-0022
November 22, 1997
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the mount of $402,957.00 and forward to the
Finance Department along with a copy of the Fee Assessment'~able. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office'
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely, ]~) ·
eth M. Gril'fin, P.E.
Director of Engineering & Public Works
cc:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE WORKSHEET
PROJECT: The Mansions By The Lake (Phase 1)
DATE: 11/22/97
Water Impact Fee:
Domestic Meter(s):
irrigation Meter(s):
Fireline Meter(s):
2 - 4 inch
2 - 8 inch
50
Total #: 52.5 ESU's @ $450.00 ea.
~100% due prior to Council approval of the final plat)
Water Tap/nspection Fee:
Total #: 2 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic/Fire):
Total #: 2 8"X4" Meter(s) @ $7,284.90
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (/rrigation/Fireline):
Total #: 0 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
'~100% due prior to issuance of water meters) '
Water Meter Deposit Fee (Domestic):
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea.
'~'100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
50 @$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 2 Domestic Water Connections @ $50.00 ea.
'~100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 2 @ $50.00 ea.
'(100% due prior to issuance of building permit)
ESU's
ESU's
ESU's
ESU's
$23,625.00
$100.00
$14,569.80
$60.00
$70.00
$22,500.00
$100.00
$100.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after October 26, 1993:
N/A
189
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
$242,865.00
$113,967.00
Information not
available at this time
Street' Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
The Man~ions By The Lake (Pha~e 1)
11/22/97
_ROADWAY IMPACT
gervice Area *
~ategory **
Use **
Development Units **
~r Develo~ent Unit **
1
Residential
189 --
2.01
$300
Roadway/mpact Fee due = (Development Units) x ~
~/ehicle Miles r Devel ment Unit) x (Fee Vehicle Mile) = $113,967.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)