Loading...
Mercantile-CS040406 (2) T H E * ¢ I T Y · 0 F C-Ois, P LL April 6, 2004 Darryl Miller Pacific Builders 3360 Wiley Post Rd, Ste 100 Carrollton TX 75006 RE: The Mercantile Addition, Phase 1 Final Acceptance Dear Mr. Miller: Representatives of the City of Coppell have confirmed a f'mal inspection of paving and utilities for the referenced project. The two-year maintenance bonds and as-built drawings have been received from the contragtor. Maturity on the bonds will be two years from the date of this letter. Sinc0tcl~,., Rick O'Doll Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 CC: Ken Griffin, Director of Engineering & Public Works Rhonda Brothers, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal