RE: The Mercantile Addition, Phase 1
Final Acceptance
Dear Mr. Miller:
Representatives of the City of Coppell have confirmed a f'mal inspection of paving and utilities
for the referenced project.
The two-year maintenance bonds and as-built drawings have been received from the contragtor.
Maturity on the bonds will be two years from the date of this letter.
Sinc0tcl~,.,
Rick O'Doll
Construction Inspector
Office Phone: (972) 304-7090
Fax: (972) 304-3570
CC:
Ken Griffin, Director of Engineering & Public Works
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Tim Oates, Fire Marshal