Loading...
Mercantile P2-CS050729COPi ELL July 29, 2005 Greg Yancey Tumer-Gesek Investments 722 S Denton Tap Rd Ste200 Coppell TX 75019 RE: Mercantile Addition, Phase 2 Dear Mr. Yancey: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Thank yo'd for your cooperation during this construction, and if I can be of further service, please contact me at (972) 304-7090. Sincerely, / Rick O' Dell Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 CC: Ken Griffin, P.E., Director of Engineering & Public Works Keith R. Marvin, P.E., Civil Engineer L/Glenn Hollowell, P.E., Asst. Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal Tom Messer, Messer Group