Loading...
Mercantile P2-CS040804DEVELOPMENT FEES PROJECT NAME: Mercantile Addition, Phase 2 ENGINEER: Dowdey, Anderson & Assoc DRIGINATION DATE: 8/4/2004 SENT 8/4/2004 ASSESSMENT Water Impact Fee $4,340.00 Wastewater Impact Fee $1,400.00 Park Fee n/a Roadway Impact-Zone $13,967.79 Street Sign Street Light Construction Inspection EG or Bore Permit Overtime Inspection Water ]'ap Inspection $150.00 Wastewater Tap Inspection $50.00 Water Meter (Domestic) $138.60 Water Meter (Fire/Irrig) $2,172.98 Meter Deposit (Domestic) $30.00 Meter Deposit (Fire/Irrig) $60.00 Utility Final Inspection $50.00 ASSESSED FEE AMOUNT PAll: DATE $4,340.00 10/21/2004 $1,400.00 10/21/2004 $13,967.79 rb 1~19~004 $4,236.14 $4,236.14 rb 11/16/2004 []Subtotal to En~l. TOTALS $18,203.93 $18,203.93 $0.00 Total Fees Fees Paid Amount Owed $26,595.51 $23,943.93 $2,651.58 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.