Loading...
Bank One-CS03060310:01 CITY OF COPPELL ENGR. DEPT. ~ SRU CTR Notches Trace Addition - Bank One Fee Assessme~t Letter June 3, 2003 Dear Mr. ODonald: Enclosed is a copy of the City of Copp¢ll Development Fcc Assessment table, along, with a copy of thc Developmenl Fee calculations for the ret'erenced development. Please make payment ibr the Impact Fees lo the City of Coppell in lhe amount of $2,658.60 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees Ihat need lo be paid prior to Council approval Please note that Ire Texas Leglslatuz¢, under Senate Bill 243, delayed the collection of Water and Sewer Impaa Fees until the issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% consn'ucfion inspection fee can be verified. The construction inspection fees must be paid prior to the scheduled pre-consmtction me~ting. The addilional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public Works Service Center, 816 S. Coppel] Road. Meters will be ordered when Ihose fees are paid, Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have :Lay questions, ptease conlact me. Sinqerely, Teresa M. Tamer, B.I.T. Graduate Engineer Jennifer Armstrong, Finance Director Mary Beth Splctzcr, Administrative Sccretary, Building Inspections Glenn Holiowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation DEVELOPMENT FEES PROJECT NAME: Natches Trace Addition, Bank One ENGINEER: Brockette-Davis-Drake ORIGINATION DATE: 6/3/2003 SENT ASSESSMENT ASSESSED FEE AMOUNT PAlE DATE 6/3/2003 Water Impact Fee $2,940.00 Wastewater Impact Fee $700.00 Park Fee n/a Roadway Impact $2,658.60 $2,658.60 rb 6/20/2003 Street Sign Street Light Construction Inspection $2,401.00 $2,401.00 rb 7/22/2003 EG or Bore Permit Overtime Inspection Water Tap Inspection $100.00 $100.00 di 8/22/2003 Wastewater Tap Inspection $50.00 $50.00 di 8/22/2003 Water Meter (Domestic) $62.25 $62.25 di 8/22/2003 Water Meter (Fire/Irrig) $205.28 $205.28 di 8/22/2003 Meter Deposit (Domestic) $30.00 $30.00 di 8/22/2003 Meter Deposit (Fire/Irrig) $30.00 $30.00 di 8/22/2003 Utility Final Inspection $50.00 $50.00 di 8/22/2003 ~Subtotal to Eng. $5,059.60 $5,059.60 $0.00 Total Fees Fees Paid Amount Owed TOTALS $9,227.13 $5,587.13 $3,640.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. 08/20/2~3 10:01 CITY OF COPPELL ENGR. DEPT. o SRU CTR ~EVELOPMENT FEE TAB~iE Natche$ Trace .4ddition, Lot 1 Block .4 ~/$105 Project: Date: TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $2,940.00 (! 00% due at Issuance of BuildinF~ Permit) Water Top Inspection Fee $100.00 (! 00% duc at I.s. suanee of Water Meter) Waler Meter Fee (Domestic) $62.'~5 (100% due at Issuance of Water Meter) Water Meter Fee (lmgation/Fireline) $205.28 (100% due at Issuance of Wa!er Meter) water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Mete.r) lrrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $700.00 (100% due at Issuance of Building Pc. trait) WasteWater Tap Inspection Fee $50.C~0 (100% due at Issuance of Buildinl~ Permit) Utili~T Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0 00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $2,658.6~' $2,658.60 '(100% due prior to Council Approval) . Street Light Fee Information not Available (100% dge' prior to Acceptance of Project) II Street Sign Fee [nfom~ation not Available (100% duc prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% duc prior to Start of C..onstmction1 TOTAL $6,826.13 TOTAL AMOUNT DUE pRioR TO COUNC. IL APPROVAL ~ $2,658.60 _803 10:01 CITY OF COPPELL ENGR. [:~_J~T. '--~EVELOPMENT FEE WORKSH£E'*~ PROJECT: DATE: Nalc~te$ Trace Addition, Lof I Block 6/$/03 Water Impart Fee~ Domestic Meter(s): Irrigation Meter(s); Fireline Meter(s): inch = 2.5 £SU'a = ~ tSU'a O ESU'a = 0 ESU's Total #: ]0.5 ESU's ~ $280.00 ea, [Due prior to issuance of bu[IPlng permit) Waler Tap Inspection ]tee: Total ~: 2 Connections ~ $50.00 ea. (Single family due prior ~o issuance of building permit) (All other developments Uue prior to issuance el ~leter) Domestic we;er Meier Fcc: Total ~: 1 Domestic Meter(s) @ $62.25 ~ami~y due prior to issuance of building permit) (All other developments clue prior to issuance of meter) IrriKefioa/Fireliae Water Mc;et Fee: Total ~t: ! I rrigatiop Meter(s) ~ Total ~: 0 A~ditionel Irrleati0n Meter(s) ~ ([0~ ~ue pr(or to ~ssuance ef water meters) $205.28 $0.00 ~,0.00 ])omeStie Water Meter Deposit Fee: Total #: t MeterCs) ~ $30,00 ea. (100% due prier to issuance of water meters) Irrigation/Fire Mater Deposit Fee: Total ~: 1 Mater(s) {~ $30,00 ea. (100% due prior to issuance of water meters) Wasrewa;er Impact Fee: Total Domestic Meters ESU's: 2.5 (0ua prior to issuance of buil0inE parm~t) $280.00 ea. Waatawater Tap Inspection Total #: i Connections ~ $50.00 ea. (~00% clue prior to issuance o~ builc]ing perr~Lt) l]tilil), final Inspection Fee (All developments): Total #', 1 Lota ~ $5000 ea. [~ue prior to issuance of building permit) $2~940.00 $100.00 $62 25 $205,28 $0 00 S0.00 $3000 $?00,00 $50.00 S50.00 Park fee (For Residcpdat Developments Only): * Prellml~lerT plat approved: After October 26, 1993 0 Single.family ~ SQO0 per lot 0 Muth.lamUy ~) $0.00 per unit (50% paid prior to CouncU approval ol fioal plat) $0.00 $0.00 Page 1 :18:81 CITY OF COPPELL ENGR. DEPT. -~ SRU CTR N0.747 IDI~I ~t3EVELOPMENT FEE WORKSHEL~ [SD~ paid at iSSuance of Duilding permit) (See attached fee calculations) Strfll Li~bU~g Fees: Asses~d for I~ti~g in the City's right*of.way This fee canno~ 0e assesseQ un~,~ afler T.U. Electric submits fha ligblin~ plan Ior ~he proposed development Once the plans are submitted, $292,60 per light wiJJ be assessed, (]00% due pr~ tO final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of, way. (See attached fee calculations if applicable) C'o~$trlclion Inspection Fees: A copy of the developmen( contract must ne Submiueo for assessment. The contracts shoul(J inoicato the cost to construct the improvements that are respected by the [ngmee~ing Departmerlt. (2% ol development cost requireo for private improvements) (4% of development co~t required for public i~provement$) $2,658,60 Information nol Available _.Information not Available Page 2 10:01 CITY OF COFPELL EN~. DEPT, ~ SF~J CTR ROA~WA.¥ IMPACT FEE CALCUL~I-rlON$ NO.?4? PRO.EECT: DATE: IV~lc&ec Trace Addition, Lot I Block,4 6/3/95 ROADWAY IMPACT FEE: O)euelopmertt Urdts) x 2 Commercial Bank 4,200 4.20 2 11 $300 Mile) - S2,65g.60 (Figure 2 - Roadway Impact Fee Study} (Table 3 - Roadway Impact Fee Study) (Schedule 2, Page 3 - Roadway Impact Fcc Study)