Loading...
Bank One-CS031211T H IE C I T ¥ 0 F COPPELL December 11, 2003 Sheila Fagg, Project Mgr. Aguirre Building Systems, Inc. 12700 Park Central Dr Floor 15 Dallas, TX 75251 RE: Natches Trace Addition, Bank One Final Acceptance Dear Ms. Fagg: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Sincerely~ ~ / Rick O'Dell Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 CC: Ken Griffin, Director of Engineering & Public Works Rhonda Brothers, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Cramp, Fire Marshal Travis Attanasio, Bmckette-Davis-Drake