Bank One-CS031211T H IE C I T ¥ 0 F
COPPELL
December 11, 2003
Sheila Fagg, Project Mgr.
Aguirre Building Systems, Inc.
12700 Park Central Dr Floor 15
Dallas, TX 75251
RE: Natches Trace Addition, Bank One
Final Acceptance
Dear Ms. Fagg:
A final inspection of paving and utilities for the referenced project has been confirmed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter.
Sincerely~ ~
/
Rick O'Dell
Construction Inspector
Office Phone: (972) 304-7090
Fax: (972) 304-3570
CC:
Ken Griffin, Director of Engineering & Public Works
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Travis Cramp, Fire Marshal
Travis Attanasio, Bmckette-Davis-Drake