Loading...
SS9901-LR051011Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: October 11, 2005 Date Concrete Placed: September 12, 2005 Client: City of Coppell Project: DeForest & Sandy Lake Wastewatar Lift Stations: Project SS 99-01 Contractor: Can-Fer Construction Concrete Supplier and Plant: Southern Star 27 Location of Placement: Wall Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 15 Project No.: 205-0126 MATERIALS s~ sso ~ w~. OBSERVATION DATA Mix Number: 7503 Time Sample Batched: 07:08 am Cement: Time Sampled: 07:38 am Sample Location: East wall - middle Fly Ash: Truck/Ticket No: 1815/1041920 Intermediate Aggregate: Ambient Range: 75°F Fine Aggregate: Concrete Range: 88°F Slump Range (inches): 8" Admixtures: Weather Conditions: Cloudy I Time Started: 06:00 am 2 Time Completed: 10:00 am Added Water: 0 gallons Sample Air Content (%): Total Cubic Yards Placed: 20 4000 Number Slump Iin.~ (Da[s) Tested (Lb~.~ (I~./Sq.ln.? DLS 57 7 09/19/05 128,240 4,540 DLS 58 28 10/10/05 186,980 6,610 DLS 59 28 10/10/05 183,460 6,490 DLS 60 H HOLD ASTM C-31re-39rC-143 (Unlegs Nord Otl~rwiset Cylinders Made By: JG Remarks and/or Distribution: * Foreman informed of slump Mr. Rick O'Dell - City of Coppell Mr. Todd C. Hoff- Canfer Construction Co. Ms. Erika K. Cooper - Turner, Collie & Braden Mr. Bobby Barr - Onsite cell: 469-556-6469 Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: October 11, 2005 Date Concrete Placed: September 12, 2005 Client: City of Coppell Project: DeForest & Sandy Lake Wastewater Lift Stations: Project SS 99-01 Contractor: Can-Fer Construction Concrete Supplier and Plant: Southern Star 27 Location of Placement: Wall Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 16 Project No.: 205-0126 MATERIALS ~r~/ SSO ~ w~,. OBSERVATION DATA Mix Number: 7503 Time Sample Batchnd: 09:08 am Cement: Time Sampled: 09:80 am Sample Location: North wall - middle Fly Ash: Truck/Ticket No: 1815/1041924 Intermediate Aggregate: Ambient Range: 85°F Fine Aggregate: Concrete Range: 90°F Slump Range (inches): 8" Admixtures: Weather Conditiom: Clear 1 Time Started: 06:00 am 2 Time Completed: 10:00 am Added Water: 0 gallons Sample Air Content (%): 3% Total Cubic Yards Placed: 60 Requit ~d Strength (Lbs./sq.ir): 4000 Numar Slump fln.) (Days} Tesw~l tLbs.} fL~./Sq.ln.) DLS 61 7 09/19/05 157,260 5,560 DLS 62 28 10/10/05 164,040 5,800 DLS 63 28 10/10/05 172,580 6,100 DLS 64 H HOLD ASTM C-31,C-391C- 143 ~Unless No~a o~,i~? Cylinders Made By: JG Remarks aed/or Distribution: * Foreman informed of slump CC: Mr. Rick O'Dell - City of Coppe0 Mr. Tndd C. Hoff- Canfer Construction Co. Ms. Erika K. Cooper - Turner, Collie & Braden Mr. Bobby Burr - Onsite cell: 469-556-6469