Loading...
SS9901-LR050928Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, ~xas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: Client: Proiect: Concrete Supplier and Plant: Location of Placement: September 28, 2005 Date Concrete Placed: September 16, 2005 City of Coppell DeForest & Sandy Lake W~stewater Lift Stations: Project SS 99-01 Can-Fer Construction Southern Star 27 Walls Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 17 Project No.: 205 -0126 MATERIALS Source7 SSD B.tch W,~ OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 7503 Time Sample Butcher: 11:00 am Cement: Time Sampled: 12:15 pm Fly Ash: Sample Location: Valve vault wall Truck/Ticket No: 97/1041997 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 80°F Fine Aggregate: Concrete Range: 92°F Admixtures: Slump Range (inches): 5" Weather Conditions: Clear I Time Started: I0:00 am 2 Time Completed: 01:00 pm Added Water: 0 gallons Sample Air Content (%): N/A Total Cubic Yards Placed: 20 Required Strength (Lbs./sq.in. 4000 Number Slump (in } (Days} Tested {Lbs ){L~s/Sqln } DLS 65 7 09/23/05 132,580 4,690 DLS 66 28 10/14/05 DLS 67 28 1 O/14/05 DLS 68 H HOLD ASTM C-3hC-39,C-143 0Jrdess Noted Othervfise} Cylinders Made By: AB Remarks and/or Distribution: * Foreman informed of slump CC: Mr. Rick O'Dell - Ciiy of Coppell Mr Todd C. Hoff - Canfer Construction Co. Ms. Erika K. Cooper - Turner, Collie& Braden Mr. Bobby Burr - Onsite cell: 469-556-6469 Reviewed by: Construction Materials Testing and Environmental Consulting Texas CMT, IBC o 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Densit,/Report No. 3 {205-0126) Method: ASTM D2922 D3017 D698 Pale 1 of 1 Client: City of Coppell Material Description Maximum Optimum Dry Moisture Density Content Project: DeForest Lift Station - Coppell (Lbd/CaFt) i:ercent Test Date: September 27, 2005 1. Brown Silt w/sand 107.3 14.6 Report Date: September 28, 2005 Required Density (%): Min. 95%-i00% Required Moisture (%): Opt. ±3%-Sand; Opt. +4%-Clay; Opt. ±2%-Lime Treated; Opt. +5 under paving Mat Locatiod/Elevation (and/or) LiR In-Place In-Place Percent No. Dry Density Moisture Compaction No. (Lbs/CuFt) Contem (%) 1 North of pump - 3' below concrete wall 3 102.5 15.4 95.5 I East side 4 106.3 15.0 99.1 1 South side 5 107.1 16.1 99.8 Test results meet project specifications cc: Mr. Rick O'Dell - Ciiy of Coppell Mr. Todd C. Hoff - Canfer Construction Co. Ms. Erlka K. Cooper - Turner, Collie & Braden Mr. Bobby Bart - Onsite cell: 469-556-6469