Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
SS9901-LR050922
Construction Materials Testing and Environmental Consulting CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Client: Concrete Supplier and Plant: September 22, 2005 Date Concrete Placed: August 25, 2005 City of Coppell DeForest & Sandy Lake Wastewater Lift Stations: Project SS 99-01 Can-Fer Construction Southern Star 29 Slab Standard 6"x 12" Area 28.27 Square Inches Concrete Report No.: ! 4 Project No.: 205-0126 MATERIALS so.~c~ SSD Batch wt, OBSERVATION DATA D~schption (Lbs/CuYd) Mix Number: 7503 Time Sample Batcbed: Cement: Time Sampled: Sample Location: Fly Ash: Truck/Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 103°F Fine Aggregate: Concrete Range: 104°F Admixtures: Slump Range (inches): 5Vd' Weather Conditions: Clear I Time Stuffed: 12:00 pm 2 Time Completed: 03: 00 pm Added Water: 0 gallons Sample Air Content (%): N/A Total Cubic Yards Placed: 9 12:42 pm 01:24 pm 20' below grade, slab below sewer pipe 1029/949403 Required Stren[th ~Lbs./sq.in., 4000 Number Slump (inI (Days) Test s.d (Das~ (Lbs/Sq In ~ DI.S 53 7 09/01/05 164,160 5.8 ! 0 DLS 54 5'A" 28 09/22/05 174,520 6,170 DLS 55 28 09/22/05 179,020 6,330 DLS 56 H HOLD ASTM C-31~C-39~C-143 (Unless Noted Otherwise) Cylinders Made By: MR Remarks and/or Distribution: Mr Rick O'Dell - City of Coppell Mr Todd C. Hoff- Canfer Construction Co Ms. Erika K. Cooper - Turner, Collie & Braden Mr. Bobby Bart - Onsite cell: 469-556-6469