SS9901-LR050824Construction Materials Testing
and Environmental Constrlting
Texas CMT, Inc.
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957
Fax (214) 352-6972 www .texascmt.com
REINFORCING STEEL PLACEMENT
Report Date: August 24, 2005
Client: City of Coppell
Project DeForest & Sandy Lake Wastewater
Lift Stations: Project - SS 99-01
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Test Date: August 22, 2005
General Report No.: 6
Project No.: 205-0126
Results
On August 22, 2005 reinforcing steel was observed at the following locations:
Valve vault slab
Pa[[e 1 of 1
There were no discrepancies
Technician: MR . ~ ~ ·
cc: Mr. Rick O'Dell - City of Coppell
Mr. Todd C. Hoff - Canfer Construction Co.
Ms. Erika K. Cooper - Turner, Collie & Braden
Mr. Bobby Ban - Onsite cell: 469-5564469
Construction Materials Testing
and Environmental Consulting
Texas CMT, Inc.
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957
Fax (214) 352-6972 www .texascmt.com
REINFORCING STEEL PLACEMENT
Report Date: August 24, 2005
Client: City of Coppell
Project DeForest & Sandy Lake Wastewater
Lift Stations: Project- SS 99-01
Reinforcing Steel Observation
Visual Observation
Identification
Method of Test
Results
Test Date: August 19, 2005
General Report No.: 5
Project No.: 205-0126
On August 19, 2005 reinforcing steel was observed at the following locations:
Valve vault slab - elevation 446.15
Pal~e 1 of 1
The following discrepancies were noted and called to the attention of Tommy, a representative of Canfer
Construction:
1. Bottom matt of steel too high ~ south end.
2. Diagonal bars missing around floor drain.
The above discrepancies will be corrected prior to concrete placement
Technician: RG
Mr. Rick O'Dell - Ciiy of Coppell
Mr. Todd C. Hoff - Canfer Construction Co.
Ms. Erika K. Cooper - Turner, Collie & Braden
Mr. Bobby Bart - Onsite cell: 469-556-6469