SS9901-LR050824Construction Materials Testing and Environmental Constrlting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REINFORCING STEEL PLACEMENT Report Date: August 24, 2005 Client: City of Coppell Project DeForest & Sandy Lake Wastewater Lift Stations: Project - SS 99-01 Identification Reinforcing Steel Observation Method of Test Visual Observation Test Date: August 22, 2005 General Report No.: 6 Project No.: 205-0126 Results On August 22, 2005 reinforcing steel was observed at the following locations: Valve vault slab Pa[[e 1 of 1 There were no discrepancies Technician: MR . ~ ~ · cc: Mr. Rick O'Dell - City of Coppell Mr. Todd C. Hoff - Canfer Construction Co. Ms. Erika K. Cooper - Turner, Collie & Braden Mr. Bobby Ban - Onsite cell: 469-5564469 Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REINFORCING STEEL PLACEMENT Report Date: August 24, 2005 Client: City of Coppell Project DeForest & Sandy Lake Wastewater Lift Stations: Project- SS 99-01 Reinforcing Steel Observation Visual Observation Identification Method of Test Results Test Date: August 19, 2005 General Report No.: 5 Project No.: 205-0126 On August 19, 2005 reinforcing steel was observed at the following locations: Valve vault slab - elevation 446.15 Pal~e 1 of 1 The following discrepancies were noted and called to the attention of Tommy, a representative of Canfer Construction: 1. Bottom matt of steel too high ~ south end. 2. Diagonal bars missing around floor drain. The above discrepancies will be corrected prior to concrete placement Technician: RG Mr. Rick O'Dell - Ciiy of Coppell Mr. Todd C. Hoff - Canfer Construction Co. Ms. Erika K. Cooper - Turner, Collie & Braden Mr. Bobby Bart - Onsite cell: 469-556-6469