REINFORCING STEEL PLACEMENT
Report Date: August 18, 2005
Client: City of Coppell
Project DeForest & Sandy Lake Wastewater
Lift Stations: Project - SS 99-01
Reinforcing Steel Observation
Visual Observation
Identification
Method of Test
Results
Test Date: August 15, 2005
General Report No.: 3
Project No.: 205-0126
On August 15, 2005 reinforcing steel was observed at the following locations:
Wet well east, south & west walls from EL 455.65 to approximately EL 445
Page 1 of 1
The following discrepancies were noted and called to the attention of Tommy, a representative of Canfer
Construction and also to the attention of Rick O'Dell of the City of Coppell:
1. Yx3' L-Bars at SE comer, elevation 455.65. Only 3'x2'6".
2. East wall was 3'-11/8" at elevation 455.65 instead of 3'2".
3. Diagonal bars around pipe in west wall missing.
4. No detail on how N-S beams shown in Sec. B, Page DS-1 should be tied into vertical walls, if at all.
Engineer please advise.
Technician:RG
Mr, Rick O'Dell - City of Coppell
Mr. Todd C. Hoff- Canfer Construction Co.
Ms. Erika K. Cooper - Turner, Collie & Braden
Mr. Bobby Barr - Onsite cell: 469-556-6469