SS9901-LR050818Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REINFORCING STEEL PLACEMENT Report Date: August 18, 2005 Client: City of Coppell Project DeForest & Sandy Lake Wastewater Lift Stations: Project - SS 99-01 Reinforcing Steel Observation Visual Observation Identification Method of Test Results Test Date: August 15, 2005 General Report No.: 3 Project No.: 205-0126 On August 15, 2005 reinforcing steel was observed at the following locations: Wet well east, south & west walls from EL 455.65 to approximately EL 445 Page 1 of 1 The following discrepancies were noted and called to the attention of Tommy, a representative of Canfer Construction and also to the attention of Rick O'Dell of the City of Coppell: 1. Yx3' L-Bars at SE comer, elevation 455.65. Only 3'x2'6". 2. East wall was 3'-11/8" at elevation 455.65 instead of 3'2". 3. Diagonal bars around pipe in west wall missing. 4. No detail on how N-S beams shown in Sec. B, Page DS-1 should be tied into vertical walls, if at all. Engineer please advise. Technician:RG Mr, Rick O'Dell - City of Coppell Mr. Todd C. Hoff- Canfer Construction Co. Ms. Erika K. Cooper - Turner, Collie & Braden Mr. Bobby Barr - Onsite cell: 469-556-6469