Loading...
SS9901-LR050727Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: Client: Prqicet: Coturaclor: Concrete Supplier and Plant: Location of Placement: July 27, 2005 Date Concrete Placed: July 19, 2005 City of Coppell DeForest & Sandy Lake Wastewater Lift Stations: Project SS 99-01 Can-Fer Construction Southern Star 27 Walls Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 4 Project No.: 205-0126 MATERIALS Sou~*~ SSl) B.~h w,~ OBSERVATION DATA Description (Lba/CuYd) Mix Number: 7503 Time Sample Batched: 08:53 am Cement: Time Sampled: 09:48 am Fly Ash: Sample Location: SE corner - 12' Truck/Ticket No: 1020/83424 I Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 88°F Fine Aggregate: Concrete Range: 98°F Admixtures: Slump Range (inches): 7" Weather Conditions: Clear 1 Time Started: 06:00 am 2 Time Completed: 05:00 pm Added Water: 0 gallons Sample Air Content (%): N/A Total Cubic yards Placed: 20 Requir ~d Stren[th tLbs./sqin. 4000 Number Slump (in) ~D~¥s) T,~d (Lbs~ ~Lbs/Sq.ln ) remarks DLS 13 7 07/26,/05 119,300 4,220 DLS 14 28 08/16/05 DLS 15 28 08/16/05 DLS 16 H HOLD ASTM C-3 hC'391C-143 {Unless Noted Otherwise} Cylinders Made By: AB Remarks and/or Dish-ibution: cc: Mr. R~ck O'Dell - Cig/of Coppell Mr. Todd C. Heft- Canfer Construction Co. Ms. Erika K. Cooper - Turner, Collie & Braden Mr. Bobby Bart - Onsite cell; 469-556-6469\.\~. Texas CMT, Inc. Reviewed by: ~ -~1"~ Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: Client: ProJect: Contractor: Concrete Supplier and Plant: Location of Placement: July 27, 2005 Date Concrete Placed: July 19, 2005 City of Coppell DeForest & Sandy LaKe Wastewater Lift Stations: Project SS 99-01 Can-Fer Construction Southern Star 27 Walls Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 5 Project No.: 205 -0126 MATERIALS So.,~ sso ~=~w. OBSERVATION DATA Description (Lb~tCuYd) Mix Number: 7503 Time Sample Batched: 09:30 am Cement: Time Sampled: 10:45 am Fly Ash: Sample Location: NE corner - 10' Truck/Ticket No: 1827/834245 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 89°F Fine Aggregate: Concrete Range: 98°F Admixtures: Slump Range (inches): 6" Weather Conditions: Clear I Time Stuff. d: 06:00 am 2 Time Completed: 05:00 pm Added Water: 0 gallons Sample Air Content (%): N/A Total Cubic Yards Placed: 60 Required Strength (Lbs,/sq.in. 4000 Numb~c Slump ~h~ ~ (Oays~ Tested (Lbs~ ~s/Sq In ? DLS 17 7 07/26/05 !36,340 ~,820 DLS 18 28 08/16/05 DLS 19 28 08/16/05 DLS 20 H HOLD ASTM &31,C-39,C-143 (U~ess Noted ~M~se) Cylinders Made By: AB Remarks and/or Distribution: cc Mr. Rick O'Dell - City of Coppell Mr. Todd C. Hoff- Canfer Construction Co. Ms. Erika K. Cooper - Turner, Collie & Braden Mr. Bobby Bart - Onalte cell: 469-556-6469 All letters and repons am for thc exclusive use oftbe client to whom [b~y a~ addre~d and ~hall not be reproduced vntbout Ih* filll approval ofTen,aa CMT,Iuc ~' The use~o cqr v~re~ musi~mve oar prior written approval Our letlers and re,oils apply o~fly to lhe sample teated and/or eb~rved and are ~ n~ce~anly indicative of the quantities of apparently idenllcal or similar products Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: Client: Prqiect: Contractor: Concrete Supplier and Plant: Location of Placement: July 27, 2005 Date Concrete Placed: July 19, 2005 City of Coppell DeForest & Sandy Lake Wastewater Lift Stations: Project SS 99-01 Can-Fer Construction Southern Star 27 Walls Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 6 Project No.: 205-0126 MATERIALS sou~ sso B.,~h w. OBSERVATION DATA Deacdp:ion (Lbs/CuYd) Mix Number: 7503 Time Sample Batched: 11:00 am Cement: Time Sampled: 12:12 pm Fly Ash: Sample Location: NW comer Truck/Ticket No: 1020/834254 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 91°F Fine Aggregate: Concrete Range: 91 °F Admixtures: Slump Range (inches): 7" Weather Conditions: Clear I Time Started: 06:00 am 2 Time Completed: 05:00 pm Added Water: 0 gallons Sample Air Content (%): N/A Total Cubic Yards Placed: 120 Required Stren[~th (Lbs./sq.in. 4000 Numb~ Slump ~in) (Da}aI Tested ~s.~ (Lbs/Sq.lfl ~ DLS 21 7 07/26/05 139,500 4,930 DLS 22 28 08/16/05 DLS 23 28 08/16/05 DLS 24 H HOLD ASTM C-3 IRC-39,C-143 ~Unless No,ed Othenvise/ Cylinders Made By: AB Remarks and/or Distribution: cc: Mr Rick O'Dell - City of Coppell Mr. Todd C. Hoff - Canfer Construction Co. Ms. Erika K. Cooper - Turner, Collie & Braden Mr. Bobby Bart - Onsite cell: 469-556-6469 Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.cora REPORT OF CONCRETE MIX OBSERVATION Report Date: Client: Prqject: Concrete Supplier and Plant: Location of Placement: July 27, 2005 Date Concrete Placed: July 19, 2005 City of Coppell DeForest & Sandy Lake Wastewater Lift Stations: Project SS 99-0l Can-Fer Construction Southern Star 27 Walls Standard 6"xl2" Area 28.27 Square Inches Concrete Report No.: 7 Project No.: 205 -0126 MATERIALS Souree~ SSD B,tch w~ OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 7503 Time Sample Batched: 12:30 pm Cement: Time Sampled: 12:59 pm Fly Ash: Sample Location: NE corner - 7' Truck/Ticket No: 648/874259 Coarse Aggregate: Temperature: Intermediate Aggregate: Panbient Range: 92°F Fine Aggregate: Concrete Range: 99°F Slump Range (inches): 6V:" Admixtures: Weather Conditions: Clear I Time Started: 06:00 am 2 Time Completed: 05:00 pm Added Water: 0 gallons Sample Air Content (%): N/A Total Cubic Yards Placed: 170 Required Sh-enbqh (Lbsdsq.in. 4000 DLS 25 7 07./26/05 145,980 5, ! 60 DLS 26 28 08/16/05 DLS 27 28 08/16/05 DLS 28 H HOLD AS~ C-31~C-39rC-143 (UMess Noted ~he~se~ Cylindem Made By: AB Remarks and/or Distribution: CC: Mr. Rick O'Deg - City of Coppell Mr. Todd C. Hoff - Canfer Construction Co. Ms. Erika K. Cooper - Turner, Collie & Braden Mr. Bobby Bmr - Onsite cell: 469-556-6469 Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 o (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: Client: Project: Contractor: £ oncrete Supplier and Plant: Location of Placement: July 27, 2005 Date Concrete Placed: July 19, 2005 City of Coppell DeForest & Sandy Lake Wastewater Lift Stations: Project SS 99-01 Can-Fer Construction Southern Star 27 Walls Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 8 Project No.: 205-0126 MATERIALS Sour~ sso B.,~h w,s OBSERVATION DATA Degcfipfion (Lbs/CuYd) Mix Number: 7503 Time Sample Batched: 12:50 pm Cement: Time Sampled: 01:34 pm Fly Ash: Sample Location: South central - 5½' Truck/Ticket No: 1029/834261 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 94°F Fine Aggregate: Concrete Range: 10 I°F Slump Range (inches): 6" Admixtures: Weather Conditions: Clear I Time Started: 06:00 am 2 Time Complet~xl: 05:00 pm Added Water: 0 gallons Sample Air Content (%): N/A Total Cubic Yards Placed: 200 Require 1 Strength tLbs./sq.in. 4000 Nurab~ Slurap lin} ~Da~s} Tested (Lbs} (Lbs/Sq In1 DLS 29 '~ 07/26/05 t 57,280 5,560 DLS 30 28 08/16/05 DLS 31 28 08/16/05 DLS 32 H HOLD ASTM C-3 IiC-3OtC- 143 (Unless Noted Otherwis~ Cylinders Made By: AB Remarks and/or Distribution: cc: Mr. Rick O'Dell - City of Coppell Mr. Todd C. Hoff - Canfer Construction Co. Ms. Erika K. Cooper - Turner. Collie & Braden Mr Bobby Barr - Onsite cell: 469-556-6469 Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 0 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: Client: Project: Concrete Supplier and Plant: Location of Placement: July 27, 2005 Date Concrete Placed: July 19, 2005 City of Coppell DeForest & Sandy Lake Wastewater Lift Stations: Project SS 99-01 Can-Fer Construction Southern Star 66 Walls Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 9 Project No.: 205-0126 MATERIALS Sour~ SSD B.,~ w,s OBSERVATION DATA Description (Lbx/CuYd) Mix Number: 7503 Time Sample Batched: 01:40 pm Cement: Time Sampled: 02:29 pm Sample Location: North central - 4' Fly Ash: Truck/Ticket No: 8871/950838 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 95°F Fine Aggregate: Concrete Range: 100°F Slump Range (inches): 6¼" Admixtures: Weather Conditions: Clear 1 Time Started: 06:00 am 2 Time Completed: 05:00 pm Added Water: 0 gallons Sample Air Content (%): N/A Total Cubic Yards Placed: 240 4000 Numbs' Slump (inI (Da~,0 Tested (Lbs.} (Lbs/Sq In} DLS 33 7 07/26/05 135,000 4,780 DLS 34 28 08/16/05 DLS 35 28 08/16/05 DLS 36 H HOLD Remarks and/or Distribution: cc: Mr. Rick O'Dell - Ciiy of Coppell Mr. Todd C. Hoff - Canfer Construction Co. Ms. Erika K. Cooper - Turner, Collie & Braden Mr. Bobby Bart - Onsite cell: 469-556-6469 Reviewed by: ~. ',,,..~J x Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Reporl Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: July 27, 2005 Date Concrete Placed: July 19, 2005 City of Coppell DeForest & Sandy Lake Wastewater Lift Stations: Project SS 99-01 Can-Fer Construction Southern Star 27 Walls Standard 6"xl2" Aree 28.27 Square Inches Concrete Report No.: 10 Project No.: 205 -0126 MATERIALS sour~ SSD B.,~h w,s OBSERVATION DATA Degcfiption (LbdCuYd) Mix Number: 7503 Time Sample Batched: 03:00 pm Cement: Time Sampled: 03:21 pm FI~ Ash: Sample Location: NE comer - 2' ' Track/Ticket No: 648/834269 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 98°F Fine Aggregate: Concrete Range: 100°F Admixtures: Slump Range (inches): 6V:" Weather Conditions: Clear I Time Star,ed: 06:00 am 2 Time Completed: 05:00 pm Added Water: 0 gallons Sample Air Content (%): N/A Total Cubic Yards Placed: 270 Required Sh'en[~h (Lbs./sq.in. 4000 Specimen Measured Age Date Total Load Compressive Strength Remarks Number Stump {in} {Da[s} Teated {Lbs) ~b$/Sq InI DLS 37 7 07/26/05 160,600 5,680 DLS 38 28 08/16/05 DLS 39 28 08/16/05 DLS 40 H HOLD Remarks and/or Disn'ibution: cc: Mr. Rick O'Dell - City of Coppell Mr. Todd C. Hoff- Canfer Consiruction Co. Ms. Erika K. Cooper - Turner, Collie & Braden Mr. Bobby Ba~r - Onsite cell: 469-556-6469