SS9901-LR050722Construction Materials Testing
and Environmental Consulting
Texas CMT, Inc.
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957
Fax (214) 352-6972 www .texascmt.cota
GENERAL REPORT
Report Date:
Client:
Project:
CANCELLATION/STANDBY
July 22, 2005
City of Coppell
DeForest & Sandy Lake
Wastewater Lift Stations: Project: SS 99-01
Identification: Cancellation
Results
Scheduled time: 03:30 pm
Type of service scheduled: Rebar
Time left lab: 03:00 pm
Time arrived at job: 03:30 pm
Time left job: 05:30 pm
Time returned to lab: 06:00 pm
Total Charged Time: 3 Hours
Reason: Not ready
Test Date: July 18, 2005
General Report No.: 1
Project No.: 205-0126
Pa[~e 1 of 1
Technician: AB
Mr. Rick O'Dell - Ciiy of Coppell
Mr. Todd C. Hoff - Canfer Construct/on Co.
Ms. Erika K. Cooper- Turner, Collie & Braden
Mr. Bobby Ban - Onsite cell: 469-556-6469
Construction Materials Testing
and Environmental Consulting
Texas CMT, Inc.
10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957
Fax (214) 352-6972 www .texascmt.com
Report Date:
Client:
Project
Identification
Method of Test
REINFORCING STEEL PLACEMENT
July 22, 2005
City of Coppell
DeForest & Sandy Lake Wastewater
Lift Stations: Project- SS 99-01
Reinforcing Steel Observation
Visual Observation
Results
On July 19, 2005 reinforcing steel was observed at the following locations:
Walls of lift station - lower 14½'
Test Date: July 19, 2005
General Report No.: 2
Project No.: 205-0126
Pat~e 1 of 1
There were no discrepancies
Technician:AB
Mr. Rick O'Dell - City of Coppell
Mr. Todd C. Hoff - Canfer Construction Co.
Ms. Erika K. Cooper - Turner, Collie & Braden
Mr. Bobby Barr - Onsite cell: 469-556-6469