Loading...
SS9901-CS051103DeForest and Sandy Lake Wastewater Lift Stations RFI No. 18 Response Date: November 3, 2005 TCB Project no. 528{33718,04000A'[03 It is acceptable to eliminate the 6-inch stabilized sub§fade for the DeForest site paving if 4.000 psi concrete is use~. The soil must be compacteci to 95% maximum density at 3% (',/-) of optimum moisture prior to placing concrete pavement. If you have any further questions, please feel free to contact Erika Cooper at 972-735-3{356. cc: Rick O'Dell, Project Inspector - City of Coppell File NOV-OS-2005 IO:06AM FROB- T-OZO P 003/003 F-040 I~ON~JITI~J~U CTI l:3 N COMIJlANy REQUEST FOR INFORMATION CONTRACT NO.:C. TO: REQUEST: DATE: RESPONSE: SIGNATU~,E: Project Man~ig~,r jCOPYi Arch[re cU~ rlg~rleer DATE: DFW Designer Dat~ Control Te~hn)rJan