SS9901-CS051103DeForest and Sandy Lake Wastewater Lift Stations
RFI No. 18
Response Date: November 3, 2005
TCB Project no. 528{33718,04000A'[03
It is acceptable to eliminate the 6-inch stabilized sub§fade for the DeForest site paving if
4.000 psi concrete is use~. The soil must be compacteci to 95% maximum density at 3% (',/-) of
optimum moisture prior to placing concrete pavement.
If you have any further questions, please feel free to contact Erika Cooper at 972-735-3{356.
cc: Rick O'Dell, Project Inspector - City of Coppell
File
NOV-OS-2005 IO:06AM FROB- T-OZO P 003/003 F-040
I~ON~JITI~J~U CTI l:3 N COMIJlANy
REQUEST FOR INFORMATION
CONTRACT NO.:C.
TO:
REQUEST:
DATE:
RESPONSE:
SIGNATU~,E:
Project Man~ig~,r
jCOPYi Arch[re cU~ rlg~rleer
DATE:
DFW Designer
Dat~ Control Te~hn)rJan