ST9301-CS 980518DALLAS COUNTY PUBLIC WORKS May 18, 1998 Mr. Ken Griffin, P.E.. City Engineer City of Coppell P. O. Box 478 Coppell, Texas 75019 Sandy Lake Road, Project 91-830 (MacArthur Boulevard to Coppell East City Limits) Plan Incorporation into City Project Dear Mr. Griffin: This letter is regarding your inquiry about County funding for the incorporation of the paving' and drainage plans from Dallas COUnty Sandy Lake Road, Project 91-830, at the MacArthur Boulevard intersection as part of the City of Coppell Sandy Lake Road project from MacArthur Boulevard to Denton Tap Road..Thc City has requested that the County plans tie to the City project at the previously determined statior~ on 'the west side of MacArthur Boulevard and that the new concrete pavement section improvements extend through the MacArthur Boulevard intersection to the east side of Kimbel Kourt with a 300 foot +/- asphalt transition. It has been determined that if the concrete pavement could be extended about another 200 feet east that storm sewer system 'D' and three private drives could largely be constructed as designed thus saving redesign time and effort along with .future construction required to modify or complete elements considered temporary as required for the transition. The probable cost for this County section of Sandy Lake Road from the end of the City section is around $500,000. The current funding estimates for Belt Line Road (91-829) and Sandy Lake Road (91-830) indicate approximately $700,000 available for Sandy Lake Road with Belt Line Road fully funded. The final estimates for the Belt Line Road (91-829) project are scheduled to be completed in June. Obviously, utilizing the probable available funds for Sandy Lake Road would reduce the contingency available for Belt Line'Road at the time that project bids, which is scheduled for fall 1998. Any project shortfall on Belt Line Road or Sandy Lake Road would have to be funded by the City. 411 Elm Street, 4th Floor Dallas, Taxes 75202 (214) 653-7151 May 18, 1998 Letter to Ken Griffin Page Two . Any monies remaining after the projects would be used for the balance of Sandy Lake Road Project 91-830, subject to the approval of the Commissioners Court, but this would likely be a small amount, if any at all, and the City would be responsible for construction costs for the remainder of Sandy Lake Road Project 91-830. Should you have any questions or comments, please feel free to contact me at (214) 653-7151. Sincerely, ,~~.~,~a- John L. Mears, P.E. Project Engineer JLM:d~