Loading...
Rozas Addn-LR051024C MJ ENGINEERING, INC. Concrete Compression Test Report 7636 Pebble Drive Fort Worth, Texas 76118 Client: Tri-Star Construction Project: Dr. Roza's Office Coppell CMJ Report No.: 548-5051-024 Report Date: 10/24/2005 Tel: (817) 284-9400 Fax: (817) 589-9993 Report Distribution: (1) Tri-Star Construcfion (1) City of Coppe[I Specifications Test Data Strength 3000 psi @ 28 Days Placement Date 09/21/2005 Slump 3 in min 5 in max Sampled By Contractor Air Content 3 % min 6 % max Weather Clear/Calm Concrete Temperature n/a Supplier/Mix Contractor Made/ Ambient Temperature n/a Air Content Method ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: n/a Time Batched: 13:00 Time Sampled: 13:30 n/a Air Content: n/a Unit Weight: n/a n/a Ambient Temperature: 98° F Yardage (¢.y.): 60 City Sidewalk at Both Sides of East and West Approaches, Private Sidewalks, Light Pole Bases, Sign Foundation and Other Flatwork City Sidewalk 6' West of East Approach Concrete Compression Test Results Age Max Load Area Strength Fracture Set # Cyl~der Test Date (days) (lbs. force) (sq.in.) (psi] Type 01 DRO09210501 09/28/2005 7 64320 28.27 2270 B-cone/split 01 DRO09210502 10/19/2005 28 95040 28.27 3360 B-cone/split 01 DRO09210503 10/19/2005 28 92500 28.27 3270 C-cone/shear 01 DRO09210504 Hold 28 day average 3320 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. *Comments: ALL INFORMATION SUPPLIED BY THE CONTRACTOR do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client, This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. o] Page 1 of I