MacPlaza1 Sonic-CS 960726The City With A Beautiful Future
P,O, Box478
Coppell, Texas 75019
214-462-0022
July 26, 1996
Mark Wainscott
Wainscott & Associates, Inc.
16775 Addison Road, Suite 360
Dallas, TX 75248
RE: MacArthur Plaza Block 1, Lot 5 (Sonic) Revised
Development Fee Assessment
Dear Mr. Wainscott:
Enclosed is a copy of the revised City of Coppell Development Fee Assessment list, along with a
copy of the Development Fee calculations for MacArthur Plaza Block 1. Lot 5 (Sonic).
Please make paymem to the City of Coppell in the amount of $5,961.10 and forward it to Jennifer
Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the
Engineer's estimate or contract for this project will need to be provided to our depa~haent so the
construction inspection fee can be verified
Providing a copy of your paid receipt to our office will help us to verify paymem of the required
fees and insure a successful beginning of this project. We look forward to working with you 9n this
project. If you have any questions, please do not hesitate to contact me.
Sincerely,
K~nneth M. Griff'm, P.E.
Assistant City Manager/City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
CITY OF COPPELL ~'~
DEVELOPMENT FEES
Date:
Project:
July 26, 1996
MacArthur Plaza Block l, Lot 5 (Sonic) Revised
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee 3,375.00 3,375.00
(100% due prior to Council Approval)
Water Tap Inspection Fee 150.00 -0-
(100% due at Issuance of Water Meter)
Wastewater Impact Fee 1,125.00 1,125.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee 50.00 -0-
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee 50.00 -0-
(100% due at Issuance of Building Permi0
Water Meter Fee (Domestic) 48.30 -0-
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-residential) 30.00 -0-
(100% due at Issuance of Water Meters)
Water Meter Fee (Irrigation & Fire) 1,487.38 -0-
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit 35.00 -0-
(100% due at Issuance of Water Meters)
Street Sign Fee -0- -0-
(100% due prior to Acceptance of Project)
Street Light Fee * information not -0-
(100% due prior to Acceptance of Projec0 available
Roadway Impact Fee 1,461.10 1,461.10
(100% due prior to Council Approval)
Construction Inspection Fee (Due prior to precon, mtg.) need submittal of -0-
(2 % of project cost due for private improvements) contracts
(4% of project cost due for public improvements)
TOTAL $ 7,811.78
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 5,961.10
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPPELL EHGIN~RING
~E~ORANDON
DATE
TO:
FROH
RE:
July 2, 1996
Mike Martin, Assistant city Engineer
Matt M. Cast, Superintendent of Public Services
Development Fees for Sonic - Macarthur Blvd. (REVISED)
The following fees should be assessed and collected on the above
Domestic Meter/s = 2.~ ESU's
Irrigation Meter/s = 2.5 ESU's
Fireline Meter/s z 2.5 ESU's
ESU's @ $450.00 ea = $3.375.00
referenced project.
Water Impact Fee:
Total
100% due prior to Council approval of the final plat.
WasteweterImpact
- 1" Domestic Meter/s ~ 2.5 ESU's
Total 2.5 ESU's @ $450.00 ea = Slo125.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
~ Connections @ $50.00 each = $150.00
lO0% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
1 Connections @ $50.00 each = $ 50.00
100% due prior to issuance of building permit.
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
1 lots @ ~ = $50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
~ - 1" Domestic Meters ~ $48.30 = S48.$0
100% due prior to issuance of building permit for residential only.
Ail other development fees ere due prior to issuance of meter/s.
Water Meter Fee (Irrtgation/Fireline)
~ - ~" Irrigation Meter/s ~ $48.30 ea
~ - 6" Fireline Meter/s ~ $ ~ = $1.439.08
Total $1.487.38
100% due prior to issuance of water meter/s.
Water Meter Deposit (Multi-Family or Mort-Residential)
~ Meters ~ S30.00 ea = S30.00
100% due prior to issuance of water meters.
Irrigation Meter Deposit
~1 Meters @ $35.00
100% due prior to issuance of water meters.