Loading...
MacPlaza1 Sonic-CS 960726The City With A Beautiful Future P,O, Box478 Coppell, Texas 75019 214-462-0022 July 26, 1996 Mark Wainscott Wainscott & Associates, Inc. 16775 Addison Road, Suite 360 Dallas, TX 75248 RE: MacArthur Plaza Block 1, Lot 5 (Sonic) Revised Development Fee Assessment Dear Mr. Wainscott: Enclosed is a copy of the revised City of Coppell Development Fee Assessment list, along with a copy of the Development Fee calculations for MacArthur Plaza Block 1. Lot 5 (Sonic). Please make paymem to the City of Coppell in the amount of $5,961.10 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the Engineer's estimate or contract for this project will need to be provided to our depa~haent so the construction inspection fee can be verified Providing a copy of your paid receipt to our office will help us to verify paymem of the required fees and insure a successful beginning of this project. We look forward to working with you 9n this project. If you have any questions, please do not hesitate to contact me. Sincerely, K~nneth M. Griff'm, P.E. Assistant City Manager/City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official CITY OF COPPELL ~'~ DEVELOPMENT FEES Date: Project: July 26, 1996 MacArthur Plaza Block l, Lot 5 (Sonic) Revised TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 3,375.00 3,375.00 (100% due prior to Council Approval) Water Tap Inspection Fee 150.00 -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee 1,125.00 1,125.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 -0- (100% due at Issuance of Building Permi0 Water Meter Fee (Domestic) 48.30 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) 30.00 -0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) 1,487.38 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Projec0 available Roadway Impact Fee 1,461.10 1,461.10 (100% due prior to Council Approval) Construction Inspection Fee (Due prior to precon, mtg.) need submittal of -0- (2 % of project cost due for private improvements) contracts (4% of project cost due for public improvements) TOTAL $ 7,811.78 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 5,961.10 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL EHGIN~RING ~E~ORANDON DATE TO: FROH RE: July 2, 1996 Mike Martin, Assistant city Engineer Matt M. Cast, Superintendent of Public Services Development Fees for Sonic - Macarthur Blvd. (REVISED) The following fees should be assessed and collected on the above Domestic Meter/s = 2.~ ESU's Irrigation Meter/s = 2.5 ESU's Fireline Meter/s z 2.5 ESU's ESU's @ $450.00 ea = $3.375.00 referenced project. Water Impact Fee: Total 100% due prior to Council approval of the final plat. WasteweterImpact - 1" Domestic Meter/s ~ 2.5 ESU's Total 2.5 ESU's @ $450.00 ea = Slo125.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee ~ Connections @ $50.00 each = $150.00 lO0% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 1 Connections @ $50.00 each = $ 50.00 100% due prior to issuance of building permit. Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots @ ~ = $50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) ~ - 1" Domestic Meters ~ $48.30 = S48.$0 100% due prior to issuance of building permit for residential only. Ail other development fees ere due prior to issuance of meter/s. Water Meter Fee (Irrtgation/Fireline) ~ - ~" Irrigation Meter/s ~ $48.30 ea ~ - 6" Fireline Meter/s ~ $ ~ = $1.439.08 Total $1.487.38 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Mort-Residential) ~ Meters ~ S30.00 ea = S30.00 100% due prior to issuance of water meters. Irrigation Meter Deposit ~1 Meters @ $35.00 100% due prior to issuance of water meters.