Loading...
MacPlaza1 Sonic-CS 960702COPPELL ENGINEERING NENORANDUN DATE: TO: FROlf : RE: July 2, 1996 Mike Martin, Assistant City Engineer Matt M. Cast, Superintendent of Public Services Development Fees for Sonic - Macarthur Blvd. The following fees should be assessed and collected referenced project. Water Impect Fee: ~ -1" Domestic Meter/s = 2.5 ESU's 1 -1" Irrigation Meter/s = 2.5 ESU's ~ -6" Fireline Meter/s = 2.5 ESU's Total 7.5 ESU's @ $450.00 ea = $3.375.00 100% due prior to Council approval of the final plat. Wastewater Impact - ~, Domestic Meter/s = 2.5 ESU's Total 2.5 ESU's ~ $450.00 ea = $~,125.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 3 Connections @ $50.00 each = $150.00 100% due prior to issuance of buildingpermit for residential. the case of multi-family, commercial, retail, industrial, prior to issuance of meter). Sewer Tap Inspection Fee ~ Connections ~ $50.00 each = $ 50.00 100% due prior to issuance of building permit. (REVISED) on the above (Or in fee is due Development Fees Page 2 Utility Final Inspection Fee (Ail Development) ~ lots @ $ 50.O0/lot = $50.00 100% due prior to issuance of building permit. Water WeterFee (Domestic) ~ - ~" Domestic Meters ~ $48.30 = 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 1 - 1" Irrigation Meter/s @ ~ - 6" Fireline Meter/s ~ $ $48.30 ea = S48.30 1.439.08ea = Sl.439.08 Total Sl.487.38 100% due prior to issuance of water meter/s. Water Meter Deposit (Wulti-Family or Non-Residential) ~ Meters @ S30.00 ea = $30.00 100% due prior to issuance of water meters. ~ Meters @ S35.00 ea = $70.00 100% due prior to issuance of water meters.