MacPlaza1 Sonic-CS 960617The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
June 17, 1996
Dowdey, Anderson and Associates, Inc.
16250 Dallas Pkwy., Suite 100
Dallas, TX 75248
PUBLIC WORKS _
RE: MacArthur Plaza Block 1, Lot 5 (Sonic)
Development Fee Assessment
Dear Sir:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee calculations for MacArthur Plaza Block 1. Lot 5 (Sonic}.
Please make payment to the City of Coppell in the amount of $3.486.10 and forward it to Jennifer
Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the
Engineer's estimate or contract for this project will need to be provided to our department so the
construction inspection fee can be verified
Providing a copy of your paid receipt to our office will help us to verify payment of the required
fees and insure a successful beginning of this project. We look forward to working with you on this
project. If you have any questions, please do not hesitate to contact me.
Sincerely,
Kenneth M. Gri m, P.E.
Assistant City Manager/City Engineer
CC;
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
CITY OF COPPELL
DEVELOPMENT FEES
Date:
Project:
June 17, 1996
MacArthur Plaza Block 1, Lot 5 (Sonic)
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee 1,575.00 1,575.00
(100% due prior to Council Approval)
Water Tap Inspection Fee 100.00 -0-
(100% due at Issuance of Water Meter)
Wastewater Impact Fee 450.00 450.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee 50.00 -0-
(100% due at Issuance of Building Permi0
Utility Final Inspection Fee '/50.00 -0-
(100% due at Issuance of Building Permi0
Water Meter Fee (Domestic) 23.21 -0-
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-residential) 30.00 -0-
(100% due at Issuance of Water Meters)
Water Meter Fee (Irrigation & Fire) 48.30 -0-
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit 35.00 -0-
(100% due at Issuance of Water Meters)
Street Sign Fee -0- -0-
(100% due prior to Acceptance of Project)
Street Light Fee * information not -0-
(100% due prior to Acceptance of Project) available
Roadway Impact Fee 1,461.10 1,461.10
(100% due prior to Council Approval)
Construction Inspection Fee (Due prior to precon, mtg.) need submittal of -0-
(2 % of project cost due for private improvements) contracts
(4% of project cost due for public improvements)
TOTAL $ 3,822.61
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 3,486.10
* This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPPELL ENGINEERING
NEHORANDUN
DATE:
TO:
FROM:
RE:
June 6, 1996
Mike Martin, Assistant city Engineer
Ted Dutt, Interim Utilities Superintendent
Development Fees for Sonic - Lot 5 Blk. 1 Macarthur Plaza
The following fees
referenced project.
Water Impect Fee:
1 - 3/4"
Total 3.5
should be assessed and collected on the above
Domestic Meter/s = ~ ESU's
Irrigation Meter/s = 2.5 ESU's
Fireline Meter/s =__ESU's
ESU's ~ $450.00 ea = $1.575.00
100% due prior to Council approval of the final plat.
Wastewater Impact
1 - 3/4"
Total 1
Domestic Meter/s = 1 ESU's
ESU's ~ $450.00 ea = S450.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
2 Connections ~ $$0.00 each = ~100.00
lOO% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
~ Connections ~ $50.00 each = $ 50,00
100% due prior to issuance of building permit.
(Residential only)
Developmen~ Fees
Page 2
Utility Final Inspection Fee (All Development)
lots @ $ 50.o0/lot = $50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 3/4" Domestic Meters ~ ~ =
$23.21
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Jater KeterFee (Irrigation/Fireline)
1 - I" Irrigation Meter/s @ $48.30 ea =
Fireline Meter/s @ $
em =
Total S48.30
100% due prior to issuance of water meter/s.
Water KeterDeposit (Multi-F~m4Zy or Non-Residential)
i Meters g $30.00 ea = $$0.00
100% due prior to issuance of water meters.
$48.30
$
/Irrigation Meter Deposit
1 Meters @ $35.00 ea
= $35.00
100% due prior to issuance of water meters.
Sonic
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
MacArthur P~aza, Lot 5, Block I (Sonic)
6/14/96
ROADWAY IMPACT FEE:
Service Area *
Cat=gory **
Land Use **
Buildin~ Siz~ (Sq. Ft.)
Development Units **
Vehicle Miles ~er Development Unit **
r Vehicle Mile
7
Commercial
Fast Food R~staura~t
1,338
1.338
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)