Loading...
MacPlaza1 City-CS 960617The City With A Beautiful Future P,O. Box 478 Coppell, Texas 75019 214-462-0022 June 17, 1996 GregMason ZellThree, Inc. ll90Explorer Street Duncanville, TX75137 PUBLIC WORKS RE: MncArthur Pla~a Block 1, Lot 2 (Common Area) Development Fee Assessment Dear S~: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee calculations for MacArthur Plaza Block 1. Lot 2 (Common Area). Please make payment to the City of Coppell in the amount of $1,125.00 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the Engineer's estimate or contract for this project will need to be provided to our depatiment so the construction inspection fee can be verified Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official CITY OF COPPELL "" DEVELOPMENT FEES Date: Project: June 17, 1996 MacArthur Plaza Block I, Lot 2(Common Area) TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 1,125.00 1,125.00 (100% due prior to Council Approval) Water Tap Inspection Fee ..~ 50.00 -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee -0- -0- (100% due prior to Council Approval) Sewer Tap Inspection Fee -0- -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee f 50.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) -0- -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) -0- -0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) ~/ 48.30 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit J35.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Roadway Impact Fee -0- -0- (100% due prior to Council Approval) Construction Inspection Fee (Due prior to precon, mtg.) need submittal of -0- (2% of project cost due for private improvements) contracts (4% of project cost due for public improvements) TOTAL $1,308.30 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $1,125.00 * This fee cannot be aasessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPpmT.~. ENGINeeRING D2~TE : TO: FRON : RE: The following fees referenced project. June 6, 1996 Mike Martin, Assistant city Engineer Matt M. Cast, Superintendent of Public Services Development Fees for Common Landscape Area - Lot 2 Blk. For Macarthur Plaza should be assessed and collected on the Water Impact Fee: Total Domestic Meter/s = ESU's Irrigation Meter/s = 2.5 ESU's Fireline Meter/s =__ESU's 2.5 ESU's ~ $450.00 ea = $1.125.00 100% due prior to Council approval of the final plat. 1 above Wastewater Impact Total Domestic Meter/s = ESU's ~ $450.00 ea = ESU's 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 1 Corn~ections ~ $50.00 each = $50.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee Con~ections ~ $50.00 each = $ 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 ility Final Inspection Fee (Ail Development) 1 lots ~ _~__50.00/lot = S50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) Domestic Meters ~ = $ 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) ~ - ~,, Irrigation Meter/s ~ $48.30ea - Fireline Meter/s @ $ Total 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) Meters ~ $30.00 ea = $ 100% due prior to issuance of water meters. c/Irri ' · gatlon Meter Deposit ~ 1 Meters ~ $35.00 ea = 100% due prior to issuance of water meters. = $48.30 ea = $ .3o Landscape