MacPlaza1 City-CS 960617The City With A Beautiful Future
P,O. Box 478
Coppell, Texas 75019
214-462-0022
June 17, 1996
GregMason
ZellThree, Inc.
ll90Explorer Street
Duncanville, TX75137
PUBLIC WORKS
RE: MncArthur Pla~a Block 1, Lot 2 (Common Area)
Development Fee Assessment
Dear S~:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee calculations for MacArthur Plaza Block 1. Lot 2 (Common Area).
Please make payment to the City of Coppell in the amount of $1,125.00 and forward it to Jennifer
Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the
Engineer's estimate or contract for this project will need to be provided to our depatiment so the
construction inspection fee can be verified
Providing a copy of your paid receipt to our office will help us to verify payment of the required
fees and insure a successful beginning of this project. We look forward to working with you on this
project. If you have any questions, please do not hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
CITY OF COPPELL ""
DEVELOPMENT FEES
Date:
Project:
June 17, 1996
MacArthur Plaza Block I, Lot 2(Common Area)
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee 1,125.00 1,125.00
(100% due prior to Council Approval)
Water Tap Inspection Fee ..~ 50.00 -0-
(100% due at Issuance of Water Meter)
Wastewater Impact Fee -0- -0-
(100% due prior to Council Approval)
Sewer Tap Inspection Fee -0- -0-
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee f 50.00 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) -0- -0-
(100% due at Issuance of Water Meter)
Water Meter Deposit (Non-residential) -0- -0-
(100% due at Issuance of Water Meters)
Water Meter Fee (Irrigation & Fire) ~/ 48.30 -0-
(100% due at Issuance of Water Meters)
Irrigation Meter Deposit J35.00 -0-
(100% due at Issuance of Water Meters)
Street Sign Fee -0- -0-
(100% due prior to Acceptance of Project)
Street Light Fee * information not -0-
(100% due prior to Acceptance of Project) available
Roadway Impact Fee -0- -0-
(100% due prior to Council Approval)
Construction Inspection Fee (Due prior to precon, mtg.) need submittal of -0-
(2% of project cost due for private improvements) contracts
(4% of project cost due for public improvements)
TOTAL $1,308.30
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $1,125.00
* This fee cannot be aasessed until after TU Electric submits the lighting plan for the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPpmT.~. ENGINeeRING
D2~TE :
TO:
FRON :
RE:
The following fees
referenced project.
June 6, 1996
Mike Martin, Assistant city Engineer
Matt M. Cast, Superintendent of Public Services
Development Fees for Common Landscape Area - Lot 2 Blk.
For Macarthur Plaza
should be assessed and collected on the
Water Impact Fee:
Total
Domestic Meter/s = ESU's
Irrigation Meter/s = 2.5 ESU's
Fireline Meter/s =__ESU's
2.5 ESU's ~ $450.00 ea = $1.125.00
100% due prior to Council approval of the final plat.
1
above
Wastewater Impact
Total
Domestic Meter/s =
ESU's ~ $450.00 ea =
ESU's
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
1 Corn~ections ~ $50.00 each = $50.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
Con~ections ~ $50.00 each = $
100% due prior to issuance of building permit.
(Residential only)
Development Fees
Page 2
ility Final Inspection Fee (Ail Development)
1 lots ~ _~__50.00/lot = S50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
Domestic Meters ~ = $
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
~ - ~,, Irrigation Meter/s ~ $48.30ea
- Fireline Meter/s @ $
Total
100% due prior to issuance of water meter/s.
Water Meter Deposit (Multi-Family or Non-Residential)
Meters ~ $30.00 ea = $
100% due prior to issuance of water meters.
c/Irri ' ·
gatlon Meter Deposit
~ 1 Meters ~ $35.00 ea
=
100% due prior to issuance of water meters.
= $48.30
ea = $
.3o
Landscape