Loading...
MacPlaza 4-CS 980106The City With A Beautiful Future PO BOX 478 COPPELL, TEXAS 75019 P.O. Box 478 CoppelL Texas 75019 972-462-0022 Sanuary 6, 1998 Wade W~lker Graham Associates, Inc. 616 Six Flags Drive, Suite 400 Arlington, TX 76011 MacArthur Plaza Addition, Lot 4, Block 1 (Upper Image Carwash) Development l~ee Assessment Dear Mr Walker: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the mount of $13,320.14 and forward to the Finance Depa~iment along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. S ¢ ly, Director of Engineering & Public Works CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: MacArthur Plaza Addition, Lot 4, Block I (Upper Image Carwash) Date: 1/6/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,725.00 $4,725.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $195.98 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) , $57.75 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100 % due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $4,995.14 $4,995.14 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submit~ of development contracts tOTAL $13,838.87 TOTAL A_MOUNT DUE PRIOR TO COUNCIL APPROVAL $13,320.14 DEVELOPMENT FEE WORKSHEET PROJECT: MacArthur Plaza Addition, Lot 4, Block 1 (Upper Image Carwash) DATE: 1/6/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): I - 2 inch 8 1 - 1 inch 2.5 Fireline Meter(s): Total #: 10.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. ~Single family due prior to issuance of building permit) (All other developments due 'prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation~Fireline): Total #: I Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $57.75 Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 8 @$450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's $4,725.00 $100.00 $195.98 $57.75 $0.00 $0.00 $30.00 $35.00 $3,600.00 $50.00 $50.00 Page 3 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285,00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U, Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $4,995.14 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 4 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: MacArthur Plaza Addition, Lot 4, Block 1 (Upper Image Carwash) 1/6/98 ROADWAY IMPACT FEE: Service Area * 7 Category ** Commercial Land Use ** Buildin~ Size (S~. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Developmem Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = Others / Not Specified (Commercial) 3,498 3.498 4.76 $300 $4,995.14 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)